My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />Testing of the thermoplastic application rate, as described above, will be required <br />following any adjustment to the thermoplastic application rate, thermoplastic <br />applicator nozzles, or any other thermoplastic application equipment prior to <br />commencement or re -commencement of striping. The initial testing and re -testing <br />of thermoplastic application rates at any location shall be considered as a single <br />thermoplastic application rate test for the approved test location. Contractor shall <br />provide a sample striping test for City approval prior to permanent striping. <br />Street sweeping of the areas to be re -striped will not be required, but obvious <br />accumulations of loose material or debris shall be removed prior to application of paint <br />or thermoplastic. <br />Thermoplastic material shall be applied to the pavement at a temperature between 4000 <br />F. and 4250 F., unless the manufacturer recommends a different temperature. <br />Section 84-2.04, "Payment," of the Caltrans Standard Specifications shall be deleted. <br />F. RAISED PAVEMENT MARKERS <br />Raised pavement markers shall conform to Section 85, "Pavement Markers," of the <br />Caltrans Standard Specifications and these Special Provisions. Reflective pavement <br />markers shall have abrasion -resistant surfaces. <br />1. Removal - The contractor shall remove any existing raised pavement markers that <br />do not conform to the channelization plans, and repair any damaged pavement due <br />to raised pavement marker removal to maintain a smooth and uniform surface per <br />SSPWC Section 302-5.6.2. Any missing or broken raised pavement markers shall <br />be replaced, in kind, within the project boundaries. <br />2. Installation - Install raised pavement markers per the channelization plans in <br />accordance with Section 85-1.06, "Placement," of the Caltrans Standard <br />Specifications and City of Santa Ana Standard Plans Nos. 1125A - 1125C. <br />Section 85-1.04, "Payment," of the Caltrans Standard Specifications shall be deleted. <br />2.03 SIGNS (ROADSIDE SIGNS) AND MARKERS <br />This section shall conform to Section 56-2, "Furnish Signs Panels," of the Caltrans <br />Standard Specifications and these Special Provisions. <br />A. GENERAL <br />All new signs shall be furnished and installed by the Contractor. The sign sizes, <br />messages, and colors shall conform to the current edition of the Caltrans Sign <br />Specifications. The sign sizes shall be the standard size shown in the Uniform Sign <br />Chart unless shown otherwise on the plans. The sign backing material shall be anodized <br />rolled sheet aluminum and shall be one piece with drilled holes for mounting. <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.