My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />6. Sample of proposed backfill material (approximate one gallon bag) <br />Sewer manhole structures shall be in conformance with all City of Santa Ana Standard <br />Plans, the Standard Specifications, and these Special Provisions and not limited to the <br />following manufacturer information: <br />1. Sewer Manhole Structure- Material composition, frame and cover <br />2. Terminal Cleanout Structure- Material composition, frame and cover <br />3. Sewer Flow Monitoring and Alarming Device <br />Sewer laterals shall be in conformance with all City of Santa Ana Standard Plans, the <br />Standard Specifications, and these Special Provisions and not limited to the following <br />manufacturer information: <br />1. SDR-26 PVC pipe, VCP pipe, HDPE pipe, and or other as approved by the <br />Engineer <br />2. Cleanout Structure- Material composition, frame and cover <br />3. Fittings <br />4. Adapters/Repair Couplings/Gaskets <br />7.00 SPECIAL PROVISIONS - WATER MAIN IMPROVEMENTS ...............NOT USED <br />8.00 SPECIAL PROVISIONS - STORM DRAIN CONSTRUCTION .............NOT USED <br />9.00 SPECIAL PROVISIONS - ELECTRICAL SYSTEM ................................NOT USED <br />10.00 SPECIAL PROVISIONS - BRIDGE CONSTRUCTION ............................NOT USED <br />11.00 SPECIAL PROVISIONS - MISCELLANEOUS CONSTRUCTION <br />11.01 CIPP LINER PIPE <br />This This work shall include installing 6", 8", 10" and 12" diameter cured -in -place (CIPP) <br />liner pipe into an existing 6", 8", 10" or 12" diameter V.C.P. sewer main. All work and <br />materials shall conform to section 500-5.5 of the Standard Specifications. The CIPP Liner <br />Pipe shall comply with Type "A" or Type `B" of the Standard Specifications. <br />Neither the CIPP Liner Pipe system, nor its installation, shall cause adverse effects to any <br />of the City's processes or facilities. The use of the product shall not result in the formation <br />or production of any detrimental compounds or by-products at the Orange County <br />III <br />
The URL can be used to link to this page
Your browser does not support the video tag.