CITY OF SANTA ANA
<br />DEFINITION OF BID ITEMS
<br />PROJECT NO.: 25-6030
<br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD
<br />AVENUE
<br />Bid Item No. 3 - Install 3" PVC Conduit
<br />This work consists of furnishing installing Polyvinylchloride (PVC) traffic signal and/or
<br />interconnect communication conduit including pull tape, ground wire, fittings, duct seal, pot
<br />holing, concrete or asphalt restoration and appurtenances complete and in place, of the size
<br />indicated on the plans.
<br />Payment for the installation of 3" PVC Conduit shall be at contract unit price bid per Linear Foot
<br />listed in the Bid Proposal and shall be considered full compensation for furnishing all labor,
<br />materials, tools, equipment, removals, paving, landscape repair, sidewalk restoration, pothole,
<br />and/or trench backfill per City Std. Plan 1150, permanent asphalt replacement, permanent PCC
<br />replacement, striping and appurtenances for all related items of work necessary for the installation,
<br />and no additional compensation will be allowed therefore.
<br />Bid Item No. 4 - Install 4" PVC Conduit
<br />This work consists of furnishing installing Polyvinylchloride (PVC) traffic signal and/or
<br />interconnect communication conduit including pull tape, ground wire, fittings, duct seal, pot
<br />holing, concrete or asphalt restoration and appurtenances complete and in place, of the size
<br />indicated on the plans.
<br />Payment for the installation of 4" PVC Conduit shall be at contract unit price bid per Linear Foot
<br />listed in the Bid Proposal and shall be considered full compensation for furnishing all labor,
<br />materials, tools, equipment, removals, paving, landscape repair, sidewalk restoration, pothole,
<br />and/or trench backfill per City Std. Plan 1150, permanent asphalt replacement, permanent PCC
<br />replacement, striping and appurtenances for all related items of work necessary for the installation,
<br />and no additional compensation will be allowed therefore.
<br />Bid Item No. 5 - Install SCE Pull Box
<br />This work consists of installing and/or replacing pull box per SCE design plan, including the
<br />removal and/or modification of any interfering portions of existing pull boxes, conduit, PCC,
<br />concrete, and asphalt restoration, as indicated on plans.
<br />Payment for the Installation of SCE Pull Box, shall be at contract unit price bid per Each Item
<br />listed in the Bid Proposal and shall be considered full compensation of furnishing all labor,
<br />materials, tools, equipment, removals, paving, landscape, repair, sidewalk restoration, and
<br />appurtenances for all related items of work necessary for the installation and no additional
<br />compensation will be allowed therefore.
<br />Bid Item No. 6 - Install No. 6 Pull Box
<br />This work consists of installing and/or replacing pull boxes including bolt down Fiberlyte Lid per
<br />City Std. Plan 1501 with bolts, the removal and/or modification of any interfering portions of
<br />existing pull boxes, conduit, PCC, concrete, and asphalt restoration, as indicated on plans.
<br />2 of 8