CONSTRUCTION NOTES:
<br />Unless otherwise specified on the working drawing which forms a part of the specification, the Contractor/Developer
<br />shall furnish the following items at no cost to the Edison Company.
<br />Southern California Edison Company has attempted to correctly show all existing utilities and substructures
<br />in the vicinity of the work, but does not guarantee there are no other substructures in the area.
<br />Failure of SCE to show all substructures in their correct location will not be a basis for a claim for extra work, and the
<br />contractor shall be responsible for all damages to substructures whether shown or not.
<br />1. FOR GENERAL SPECIFICATIONS SEE UGS GI 001.
<br />2. CONDUIT:
<br />a. Minimum cover in street or parkway is 30" below gutter grade, unless noted otherwise.
<br />b. Minimum cover on private property is 30" below finished grade, unless noted otherwise.
<br />c. Contractor is to furnish and install approved conduit to Edison specifications per UGS CD 100.1, 110 AND 120.
<br />d. For the type of conduit for this job, See UGS CD 110.1.
<br />e. Install all risers per UGS CD 160, 161, 162 and 170.
<br />f. Cap all mainline conduits per UGS CD 148 and service conduits per UGS CD 150.
<br />g. Install blank conduit plugs in all conduits terminating into Vaults, Manhole's, PMH's, SCE's & all cap locations,
<br />per UGS CD 180.1 & UGS CD 180.2
<br />h. Install pull rope in all conduit runs. Pull rope to be at least 3/8" polypropylene rope, braided or twisted.
<br />For specifications, approved makes, and suppliers, see UGS GI 040.
<br />i. All conduit must be mandreled with the approved mandrel UGS CD 197.
<br />3. CONDUIT RADIUS REQUIREMENTS:
<br />a: The minimum radius for bends are:
<br />36" for conduits 3" in diameter or smaller
<br />48" for conduits 4" and 5" in diameter
<br />60" for 6" diameter conduit
<br />b: The minimum radius for all sweeps of all mainline conduits is 12'-6" (unless noted otherwise).
<br />4. EXCAVATION AND BACKFILL:
<br />a. Work area shall be cleared and rough graded to within four inches of final grade prior to installation of
<br />Edison conduit or structures.
<br />b. All excavations shall be in accordance with the California State Construction Safety Orders (when applicable),
<br />Edison specifications, and all governing local ordinances.
<br />c. Each trench to be a uniform depth below final grade prior to installation of Edison conduit or structures.
<br />d. Backfill shall be provided by the Contractor for all excavations and shall include crushed rock, concrete,
<br />and/or imported backfill, when required.
<br />e. Backfill with a MINIMUM of one sack per yard sand cement slurry around and over vaults and manholes per
<br />UGS GI 030, section 6.4 and around PMH's within one foot of finished grade, per UGS SS 590.1.
<br />f. Backfill, per Edison specifications, shall immediately follow conduit or substructure installation. At no time
<br />shall conduit be left exposed over 24 hours.
<br />g. No rocks are allowed within 12 inches of direct -buried cables or any conduit without concrete encasement.
<br />Native backfill capable of passing through a one-half inch mesh screen shall be considered to be "rock free".
<br />If existing backfill does not pass through a 1/2" screen, place imported sand 3" below and 12" above Edison
<br />cables. After this point, no rocks larger than 12" diameter are permitted.
<br />h. All backfill shall be compacted to meet or exceed local ordinances or other requirements. It shall be placed
<br />in a manner that will not damage the conduit or substructure or allow future subsidence of the trench or
<br />structures.
<br />5. PAVING:
<br />Repaving, where required, shall be placed in such a manner that interference with traffic, including
<br />pedestrian traffic, will be kept to a minimum. The Contractor shall establish a program of repaving acceptable
<br />to the Municipality, County, or other authority having jurisdiction and which is acceptable to Edison.
<br />6. STRUCTURES:
<br />a. All substructures shall be constructed or installed to Edison specifications.
<br />b. Install protection barriers per UGS MS 830 when required in areas exposed to traffic, per Edison Inspector.
<br />c. All conduit lines and concrete floored substructures shall be water tight.
<br />d. All grounding materials shall be furnished and installed by the Contractor.
<br />7. RETAINING WALLS:
<br />When required, retaining walls shall be provided by the Developer. Walls are required wherever grade rises
<br />more than 18 inches above the structure or 24" above the pad surface at a distance of 5 feet from the same,
<br />or in areas subject to erosion. Design and installation must comply with local building ordinances.
<br />Refer to Edison Inspector for typical space requirements.
<br />8. PERMITS:
<br />All permits necessary for excavation shall be provided by the Contractor/Developer.
<br />9. ACCESS:
<br />Heavy truck access shall be maintained to equipment locations. Structures must be clear of all appurtenances
<br />that would obstruct the loading or unloading of equipment.
<br />10. SERVICES:
<br />a. Meters and services shall comply with Edison Electrical Services Requirements.
<br />b. Wiring must be in accordance with applicable local ordinances and approved by local Inspection Authorities.
<br />11. LOCATION:
<br />a. The location of excavations and structures for Edison shall be as shown on the working drawing. No deviation
<br />from the planned locations will be permitted unless approved by the Edison Inspector. See UGS GI 001, section 2.2.
<br />b. Actual location of obstructions, storm drains, and/or other foreign utilities to be the responsibility of the
<br />Contractor. See UGS GI 001, section 2.3.
<br />12. Contractor is to verify location and widths of all sidewalks and driveways prior to street light installation.
<br />See UGS CD 175.1, UGS CD 175.2 and UGS CD 175.3.
<br />13. SURVEY:
<br />Surveying of street improvements, property corners, lot lines, finished grade, etc., necessary for the installation
<br />of underground facilities must be completed and markers or stakes placed prior to the start of the installation.
<br />In addition, Developer shall maintain the markers during the installation and inspection by Edison.
<br />Grade and property line stakes must show any offset measurements.
<br />14. COORDINATION AND SUPERVISION:
<br />The Developer shall provide supervision over and coordination among the various contractors working within the
<br />development in order to prevent damage to Edison facilities. He is responsible for the cost of repairs,
<br />replacement, relocation, or other corrections to Edison facilities made necessary by his failure to provide
<br />supervision or to otherwise comply with these specifications.
<br />15. TELEPHONE AND OTHER UTILITY REQUIREMENTS:
<br />The drawing prepared for this job may also cover the facilities to be installed for the telephone company
<br />and/or other utility. Any questions concerning details of their installation should be referred to the company
<br />concerned.
<br />16. OWNERSHIP:
<br />Developer is to deed to the Edison Company all structures shown hereon except those shown as customer owned.
<br />17. WARRANTY:
<br />Applicants expressly represent and warrant that all work performed and all material used in meeting Applicants'
<br />obligations herein are free from defects in workmanship and are in conformity with Southern California Edison
<br />Companys requirements. This warranty shall commence upon receipt by Applicants of Companys final acceptance
<br />and shall expire one year from that date. Applicants agree to promptly correct to the Company's satisfaction
<br />and that of any governmental agency having jurisdiction and at Applicant's expense any breach of this warranty
<br />which may become apparent through inspection or operation of underground electric system by Company during this
<br />warranty period.
<br />18. INSPECTION:
<br />Inspection is required during the construction period. A 48 hour advance notice of intent to start construction
<br />is required from the contractor to the Southern California Edison Company. Standards of Edison construction
<br />requirements are available upon request.
<br />Duct and Structure Inspector: FREDDY MARTINEZ Phone: 714 285-4374
<br />Cabling Construction Coordinator: FREDDY MARTINEZ Phone: 714 285-4374
<br />1(:F
<br />TYPICAL CONDUIT BANK SECTION
<br />SEE UGS CD 120
<br />z N
<br />i
<br />Io
<br />1 1�„
<br />1 BEDDING
<br />DIRECT BURIAL
<br />SIMILAR CONSTRUCTION FOR FEWER CONDUIT
<br />2 CONDUITS MAX.
<br />REQUIR
<br />WORKIN
<br />NOTE:
<br />ALL ELECTRICAL DUCTS AND STRUCTURES WILL
<br />CONFORM TO GENERAL ORDER #128 (RULES FOR
<br />CONSTRUCTION OF UNDERGROUND ELECTRICAL
<br />SUPPLY AND COMMUNICATION PRESCRIBED BY THE
<br />PUBLIC UTILITIES COMMISSION OF THE STATE
<br />OF CALIFORNIA, JANUARY 2006).
<br />CONNECTING TO EXISTING SCE STRUCTURES
<br />• Per SCE requirements, customers are not allowed to enter, intercept or
<br />tie-in to existing SCE facilities; e.g. structures, equipment, multi -conduit
<br />runs/banks, or conductors. These facilities may be energized and the
<br />work will only be performed by SCE. Contact the appropriate SCE
<br />inspector to schedule an appointment. Customers may connect to an
<br />existing conduit stub without a SCE inspector present.
<br />• Multi -conduit runs/banks are runs of conduit in close proximity to each
<br />other and other SCE facilities. A conduit stub is a single empty conduit
<br />stub that is not in close proximity to other SCE owned facilities. Refer
<br />to the work order map for details.
<br />• Per CPUC/SCE's Rule 15 B.1.A and Rule 16 D.I.A., the customer will
<br />provide all necessary excavations (with the exception of excavation under
<br />pads and primary splice boxes), material (including conduit and
<br />structures) and encasement, to be utilized in the intercept/tie-in
<br />process.
<br />• The customer must adhere to all applicable Cal -OSHA, local, city, state
<br />and federal regulations, (including, but not limited to, all necessary
<br />shoring and traffic control in place to perform the intercept/tie-in work
<br />by SCE's underground civil contractor(s)).
<br />• Intercept/tie-in work must be coordinated with SCE's civil contractors
<br />through the Division Inspector/P-Spec to limit exposure of excavation(s).
<br />Customer is responsible for securing excavation(s).
<br />D08: 11/13/18
<br />TIE-IN MADE INTO A SECONDARY HANDHOLE
<br />If PVC conduit is used, riser bend installation may
<br />be made by the customer with prior SCE approval.
<br />Customer not to remove handhole cover. If metallic
<br />conduit is used or handhole cover needs to be removed,
<br />a SCE Qualified Person must be present.
<br />WARNING
<br />THE EXCAVATOR MUST TAKE ALL STEPS NECESSARY TO AVOID
<br />CONTACT WITH UNDERGROUND FACILITIES WHICH MAY RESULT IN
<br />INJURY TO PERSONS OR DAMAGE TO FACILITIES IN THE AREA.
<br />THE INDICATED LOCATIONS OF EDISON UNDERGROUND FACILITIES,
<br />AS PROVIDED, ARE BELIEVED TO BE ACCURATE, HOWEVER, THE
<br />FINAL DETERMINATION OF EXACT LOCATIONS AND THE COST OF
<br />REPAIR TO DAMAGED FACILITIES IS THE RESPONSIBILITY OF THE
<br />EXCAVATOR.
<br />CUSTOMER -OWNED CONDUIT MATERIAL* AND CONCRETE
<br />ENCASEMENT ARE TO BE INSTALLED IN ACCORDANCE WITH
<br />EDISON ELECTRICAL SERVICE REQUIREMENTS.
<br />*SUBJECT TO APPROVAL BY LOCAL INSPECTION AUTHORITIES
<br />D14: G?;. :'�,
<br />LEGEND CODE DEFINITIONS
<br />Cl - CUSTOMER CONTRACTOR INSTALLED: MATERIALS FURNISHED AND
<br />INSTALLED BY APPLICANT AT EDISON'S EXPENSE AND ARE DEEDED
<br />TO EDISON. (EXCEPTION: STREET LIGHT ELECTROUERS WILL BE
<br />INSTALLED BY EDISON'S CONTRACTOR.)
<br />CO - CUSTOMER CONTRACTOR OWNED: MATERIALS FURNISHED. INSTALLED.
<br />OWNED. AND MAINTAINED BY APPLICANT.
<br />CF - CUSTOMER CONTRACTOR FURNISHED: MATERIALS FURNISHED AND
<br />INSTALLED BY APPLICANT AT APPLICANT'S EXPENSE THAT MAY BE
<br />DEEDED TO EDISON.
<br />IN - INSTALL: MATERIALS FURNISHED AND INSTALLED BY APPLICANT IF
<br />APPLICANT INSTALLED PROJECT OR BY EDISON IF EDISON INSTALLED
<br />PROJECT. (EXCEPTION: FOR AN APPLICANT INSTALLED LINE EXTENSION.
<br />STATION NOS.
<br />HAVING AN ASTERISK ADJACENT TO AN "IN" LEGEND CODE REPRESENTS
<br />MATERIALS TO BE PROVIDED BY APPLICANT AND INSTALLED BY EDISON
<br />IN ALL CASES. REFER TO DPB 8258. PROJECT MATERIAL LIST BY
<br />ASSEMBLY WITHIN A STATION.)
<br />MI - MEMO INSTALL: SAME AS IN -INSTALL
<br />MR - MEMO REMOVE: MATERIALS REMOVED BY EDISON.
<br />RM - MEMO REMOVED: MATERIALS REMOVED BY EDISON.
<br />SI - SHOOFLY IN: MATERIALS FURNISHED AND INSTALLED BY EDISON FOR
<br />TEMPORARY CONSTRUCTION.
<br />SR - SHOOFLY REMOVE: MATERIALS REMOVED BY EDISON FOR TEMPORARY
<br />CONSTRUCTION.
<br />TR - TRANSFER: EDISON LABOR REQUIRED TO TRANSFER EXISTING FACILITIES.
<br />UNDERGROUND SERVICE ALERT
<br />Contact USA
<br />Dial 811 or 800-422-4133
<br />www.digalert.org/contact
<br />For Underground Locating
<br />Two Working Days Before You Dig
<br />o F ,
<br />LEGEND OF CONDUIT SYMBOLS
<br />(CONVENTIONAL U. G.)
<br />EDISON
<br />NO. CONDUIT REQ'D.so7E-
<br />f SIZE OF CONDUIT
<br />RUN NO. LENGTH OF CONDUIT RUN
<br />TRENCH
<br />TYPE OF FACILITY
<br />(CIC-DB, ETC.) Do
<br />RUN NO7E] f LENGTH OF TRENCH
<br />STREET LIGHT
<br />NO. CONDUIT REQ'D.� f SIZE OF CONDUIT
<br />RUN NO. f LENGTH OF CONDUIT RUN
<br />STREET LIGHT
<br />TRENCH
<br />TYPE OF FACILITY
<br />RUN NO.� f LENGTH OF ADDITIONAL
<br />TRENCH REQ'D.
<br />EDISON
<br />N0. CONDUIT REQ'D. SIZE OF CONDUIT
<br />� REFERENCE RUN NO.MEMO DENOTES CONDUIT RUN CONTINUATION
<br />FOR CONSTRUCTION INFORMATION
<br />STREET LIGHT
<br />NO. CONDUIT REQ'D. f SIZE OF CONDUIT
<br />REFERENCE RUN NO.: MEMO f DENOTES CONDUIT RUN CONTINUATION
<br />FOR CONSTRUCTION INFORMATION
<br />ANY OF THE ABOVE SYMBOLS
<br />FOLLOWED BY A
<br />PANEL CLEARANCE
<br />UNDERGROUND SERVICE CONNECTIONS 0-600 VOLTS
<br />SEE ESR 3-16
<br />SIDE VIEW
<br />DENOTES THE FOLLOWING:
<br />DB CONDUIT WITHOUT ENCASEMENT IS
<br />ACCEPTABLE FOR PORTIONS OF TRENCH
<br />WITH ONLY ONE OR TWO CONDUITS
<br />SEMI -ENCASEMENT IS REQUIRED FOR
<br />PORTIONS OF TRENCH WITH ONLY
<br />THREE OR FOUR CONDUITS
<br />FULL ENCASEMENT IS REQUIRED FOR
<br />MORE THAN FOUR CONDUITS
<br />NOTES:
<br />1. A MINIMUM OF THREE (3) FEET OF CLEAR, LEVEL WORK SPACE IS REQUIRED IN FRONT OF ALL TERMINATION, METERING, AND SERVICE
<br />EQUIPMENT.
<br />2. SEE ESR-5 FOR
<br />WORKING SPACE METER - THE MOUNTINGCENTERLINHEIGHT
<br />THE MEREQUIREMENTS. METER MOUNTING HEIGHT WILL BE MEASURED FROM THE STANDING AND
<br />3. WHEN SERVICE EQUIPMENT IS INSTALLED ON AN ELEVATED PORTION OF THE FLOOR/GROUND, OR HOUSEKEEEPING PAD, THE PAD SHALL BE
<br />FLUSH WITH AND EXTEND A MINIMUM OF THREE (3) FEET. THIS IS MEASURED FROM THE FRONT OF THE SERVICE EQUIPMENT OR THE OUTER
<br />DOOR(S) OF THE SWITCHBOARD NEMA 3R ENCLOSURE WHEN INSTALLED. IN NO CASE SHALL THE MAXIMUM METER HEIGHT OF SIX (6) FEET
<br />THREE (3) INCHES BE EXCEEDED.
<br />4. TO MAINTAIN A SAFE, CLEAR, AND LEVEL WORKING AREA IN FRONT OF NEW OR EXISTING METER AND SERVICE EQUIPMENT, A CONCRETE SLAB
<br />OR OTHER SUITABLE PERMANENT HARD SURFACE, ACCEPTABLE TO THE COMPANY, MUST BE USED.
<br />5, FOR SWITCHBOARDS ABOVE 60OV, FIVE-FOOT MINIMUM OF CLEAR AND LEVEL STANDING AND WORKING SPACE IS REQUIRED IN THE FRONT,
<br />REAR, AND SIDE OF ANY SECTION WHERE SUCH PART SUPPORTS OR PROVIDES ACCESS TO METERING, TESTING EQUIPMENT, OR SERVICE
<br />CABLE TERMINATION SECTIONS.
<br />16.12 PROTECTIVE BARRIERS FOR SERVICE EQUIPMENT
<br />BARRIER POSTS ARE USED TO PROTECT THE METER AND SERVICE EQUIPMENT, AS WELL AS PERSONNEL,
<br />FROM VEHICULAR CONTACT, AND TO PROHIBIT ENCROACHMENT INTO THE WORKING SPACE.
<br />(FOR EXAMPLE: LOADING ZONES, DRIVEWAYS, CONGESTED AREAS, OFF STREET PARKING, AND SO ON).
<br />THE CUSTOMER SHALL PROVIDE AND INSTALL "NON -REMOVABLE" BARRIERS TO PROVIDE THE PROPER SAFE
<br />WORKING CLEARANCES WHERE THE WORKSPACE IS EXPOSED TO VEHICULAR OR OTHER HAZARDOUS CONDITIONS.
<br />METERS WILL NOT BE SET UNTIL THE BARRIERS HAVE BEEN INSTALLED.
<br />EXISTING SINGLE LINE 1-28-2024
<br />BISMUTH 12KV % CAMDEN B1
<br />0 P� RM 25KVA 120/240 1P
<br />O
<br />B5077653
<br />-14
<br />Gov
<br />P5074968
<br />0897E 111A GP
<br />P5074562 �^ B5077654 \
<br />aoo
<br />AO B5077655 OG B5077652
<br />B AB A ;0 \�
<br />136314 P5073899 �.� L
<br />1200
<br />80894E P5073898
<br />(01 Y I �PJ
<br />P5073897 I m g���
<br />3893 B5077651
<br />m I HAB 'B5077656
<br />894 _ 00��
<br />B5077461 ��` B5077460
<br />I I ./• 3
<br />P5073896 I I �Ps • 4444590E
<br />1130007E
<br />V.�
<br />ALLJ B 0563
<br />P5073895 4444589E P5074499
<br />4752179E LOAD BREAK N
<br />11� JG
<br />1130004E �S5539998
<br />4444588E
<br />P5074968 AFL r,
<br />i80897E� � GP
<br />P5074562 �- B5077654
<br />..-Ell1
<br />3900 AiAO
<br />LOR�;titi�
<br />17"00" 00" FRP
<br />IN:1-6W BAR 1P
<br />PROPOSED SINGLE LINE
<br />BISMUTH 12KV % CAMDEN 61
<br />N 50KVA 120/240 f
<br />1 B5077653
<br />-Po
<br />N�
<br />B5077655 O B5077652
<br />B AB P5073899 �.
<br />A %
<br />J036314
<br />_ I •`
<br />1680894E P5073898
<br />01 <
<br />P5073897 I m
<br />73893 i B5077651
<br />• F
<br />B B5077656
<br />r3894 OG�
<br />B5077461 �� 65077460
<br />P5073896 .�•/ 4444590E
<br />I I ./ 1130007E
<br />PS
<br />A B V 0563
<br />P5073895 4444589E P5074499
<br />4752179E LOAD BREAK N
<br />�G
<br />� Flo
<br />G. & -,.-- -- <� orronnno
<br />SN:
<br />CR:
<br />1 -
<br />S HH PLAS 13"X24"X15"
<br />RM:
<br />4 -
<br />CNN BAR INS LT DUTY #8-350 1P 4-WAY
<br />IN:
<br />1 -
<br />TR UG BT MC DE 50KVA 6.9KV 120/240 1P+
<br />SN:
<br />Cl:
<br />1 -
<br />S HH FIBER 17X30X30 SEC/PRI CIC REPL CBL
<br />Cl:
<br />1 -
<br />SS TAX EXCV CST FOR BD/PAD/PB/PME/SB/SOE
<br />IN:
<br />4 -
<br />CNN BAR INS LT DUTY #8-350 1P 6-WAY
<br />CF:
<br />152
<br />- CM DUCT 2 1 /2" TO 4"
<br />CF:
<br />152'
<br />- CM DUCT FOR EXCAVATION
<br />IN:
<br />152'
<br />- CBL 2-1/0 1-2 AL 3-1/C 600V CLP PLEX
<br />MI:
<br />30'
<br />- CBL 2-1/0 1-2 AL 3-1/C 600V CLP PLEX
<br />IN:
<br />1 -
<br />MTR KWH 30A 120/240 1P 3W
<br />CREW NOTES:
<br />-VEHICULAR TRAFFIC CONTROL REQUIRED - CATTCH DWG#9
<br />-PEDESTRIAN TRAFFIC CONTROL REQUIRED - ROUTE #4
<br />-INSTALL 3/C 2-1/0 & 1-#2 PLEX CABLE FROM HH TO NEW PEDESTAL
<br />-REPLACE 25KVA WITH A 50KVA XFMR IN BURD B5077653
<br />-REPLACE UTILCO BARS IN BURD B5077653 WITH 6-WAY UTILCO BARS
<br />-REPLACE HANDHOLE AND UTILCO BARS WITH 6-WAY UTILCO BARS
<br />-INSTALL 900 METER FOR THE NEW PEDESTAL ® 2902 3/4 S ROSEWOOD SANTA ANA
<br />-SOURCE XFMR STR# B5077653
<br />CUSTOMER NOTES:
<br />-CUSTOMER TO INSTALL 3" CONDUIT FROM HH TO NEW PEDESTAL
<br />-CUSTOMER TO INSTALL NEW PEDESTAL ® 12902 3/4 S ROSEWOOD SANTA ANA
<br />CONTACT INFO:
<br />SCE PLANNER -
<br />NAME: SANDEEP TALLURI
<br />PHONE: 657-212-0095
<br />CUSTOMERISITE CONTACT:
<br />NAME. STEVE PEREZ
<br />PHONE- 714-647-5612
<br />SCE Inspection
<br />Contact SGE 48 Hours in advance for a
<br />Pre -Construction meeting andror Inspection.
<br />SCE INSPECTOR -
<br />NAME - FREDDY MARTINEZ
<br />PHONE: 714-285-4374
<br />SOUTHERN CALIFORNIA
<br />EDISON
<br />An EDISON INTERNATIONAL Company
<br />SCALE: 1 " = 40'
<br />PROJECT REQUIREMENTS
<br />(Y/N�
<br />EDISON EASEMENT REQUIRED
<br />0
<br />PWRD 88 REQUIRED
<br />0
<br />UG CIVIL ONLY WORK ORDER
<br />0
<br />PERMIT REQUIRED
<br />0
<br />PERMIT TYPE: TRAFFIC CONTROL
<br />OUTAGE REQUIRED
<br />❑Y
<br />OUTAGE DATE: TIME:
<br />TRAFFIC CONTROL REQUIRED
<br />❑Y
<br />PED. TRAFFIC CONTROL REQ'D
<br />❑Y
<br />CONVEYANCE LETTER REQ'D
<br />❑N
<br />ENVIRONMENTAL REQUIREMENTS
<br />❑
<br />DOCUMENT (ERD) REQUIRED
<br />CSD 140 (TLM) REQ'D
<br />❑Y
<br />CIRCUIT MAP CHANGE REQ'D (TD 203)
<br />❑N
<br />DIG ALERT APP
<br />❑Y
<br />VERIFIED ACTIVE AND
<br />❑
<br />CONFIRMED USA TICKETS
<br />UTILIQUEST NOTIFIED
<br />❑
<br />STANDARD ADHERENCE: 4 Q/ 2023 Y
<br />C_'USTOMER MAI�
<br />FINAL DESIGN
<br />APPROVED / • CONSTRUCTION
<br />0 40 80