CONSTRUCTION NOTES: <br />Unless otherwise specified on the working drawing which forms a part of the specification, the Contractor/Developer <br />shall furnish the following items at no cost to the Edison Company. <br />Southern California Edison Company has attempted to correctly show all existing utilities and substructures <br />in the vicinity of the work, but does not guarantee there are no other substructures in the area. <br />Failure of SCE to show all substructures in their correct location will not be a basis for a claim for extra work, and the <br />contractor shall be responsible for all damages to substructures whether shown or not. <br />1. FOR GENERAL SPECIFICATIONS SEE UGS GI 001. <br />2. CONDUIT: <br />a. Minimum cover in street or parkway is 30" below gutter grade, unless noted otherwise. <br />b. Minimum cover on private property is 30" below finished grade, unless noted otherwise. <br />c. Contractor is to furnish and install approved conduit to Edison specifications per UGS CD 100.1, 110 AND 120. <br />d. For the type of conduit for this job, See UGS CD 110.1. <br />e. Install all risers per UGS CD 160, 161, 162 and 170. <br />f. Cap all mainline conduits per UGS CD 148 and service conduits per UGS CD 150. <br />g. Install blank conduit plugs in all conduits terminating into Vaults, Manhole's, PMH's, SCE's & all cap locations, <br />per UGS CD 180.1 & UGS CD 180.2 <br />h. Install pull rope in all conduit runs. Pull rope to be at least 3/8" polypropylene rope, braided or twisted. <br />For specifications, approved makes, and suppliers, see UGS GI 040. <br />i. All conduit must be mandreled with the approved mandrel UGS CD 197. <br />3. CONDUIT RADIUS REQUIREMENTS: <br />a: The minimum radius for bends are: <br />36" for conduits 3" in diameter or smaller <br />48" for conduits 4" and 5" in diameter <br />60" for 6" diameter conduit <br />b: The minimum radius for all sweeps of all mainline conduits is 12'-6" (unless noted otherwise). <br />4. EXCAVATION AND BACKFILL: <br />a. Work area shall be cleared and rough graded to within four inches of final grade prior to installation of <br />Edison conduit or structures. <br />b. All excavations shall be in accordance with the California State Construction Safety Orders (when applicable), <br />Edison specifications, and all governing local ordinances. <br />c. Each trench to be a uniform depth below final grade prior to installation of Edison conduit or structures. <br />d. Backfill shall be provided by the Contractor for all excavations and shall include crushed rock, concrete, <br />and/or imported backfill, when required. <br />e. Backfill with a MINIMUM of one sack per yard sand cement slurry around and over vaults and manholes per <br />UGS GI 030, section 6.4 and around PMH's within one foot of finished grade, per UGS SS 590.1. <br />f. Backfill, per Edison specifications, shall immediately follow conduit or substructure installation. At no time <br />shall conduit be left exposed over 24 hours. <br />g. No rocks are allowed within 12 inches of direct -buried cables or any conduit without concrete encasement. <br />Native backfill capable of passing through a one-half inch mesh screen shall be considered to be "rock free". <br />If existing backfill does not pass through a 1/2" screen, place imported sand 3" below and 12" above Edison <br />cables. After this point, no rocks larger than 12" diameter are permitted. <br />h. All backfill shall be compacted to meet or exceed local ordinances or other requirements. It shall be placed <br />in a manner that will not damage the conduit or substructure or allow future subsidence of the trench or <br />structures. <br />5. PAVING: <br />Repaving, where required, shall be placed in such a manner that interference with traffic, including <br />pedestrian traffic, will be kept to a minimum. The Contractor shall establish a program of repaving acceptable <br />to the Municipality, County, or other authority having jurisdiction and which is acceptable to Edison. <br />6. STRUCTURES: <br />a. All substructures shall be constructed or installed to Edison specifications. <br />b. Install protection barriers per UGS MS 830 when required in areas exposed to traffic, per Edison Inspector. <br />c. All conduit lines and concrete floored substructures shall be water tight. <br />d. All grounding materials shall be furnished and installed by the Contractor. <br />7. RETAINING WALLS: <br />When required, retaining walls shall be provided by the Developer. Walls are required wherever grade rises <br />more than 18 inches above the structure or 24" above the pad surface at a distance of 5 feet from the same, <br />or in areas subject to erosion. Design and installation must comply with local building ordinances. <br />Refer to Edison Inspector for typical space requirements. <br />8. PERMITS: <br />All permits necessary for excavation shall be provided by the Contractor/Developer. <br />9. ACCESS: <br />Heavy truck access shall be maintained to equipment locations. Structures must be clear of all appurtenances <br />that would obstruct the loading or unloading of equipment. <br />10. SERVICES: <br />a. Meters and services shall comply with Edison Electrical Services Requirements. <br />b. Wiring must be in accordance with applicable local ordinances and approved by local Inspection Authorities. <br />11. LOCATION: <br />a. The location of excavations and structures for Edison shall be as shown on the working drawing. No deviation <br />from the planned locations will be permitted unless approved by the Edison Inspector. See UGS GI 001, section 2.2. <br />b. Actual location of obstructions, storm drains, and/or other foreign utilities to be the responsibility of the <br />Contractor. See UGS GI 001, section 2.3. <br />12. Contractor is to verify location and widths of all sidewalks and driveways prior to street light installation. <br />See UGS CD 175.1, UGS CD 175.2 and UGS CD 175.3. <br />13. SURVEY: <br />Surveying of street improvements, property corners, lot lines, finished grade, etc., necessary for the installation <br />of underground facilities must be completed and markers or stakes placed prior to the start of the installation. <br />In addition, Developer shall maintain the markers during the installation and inspection by Edison. <br />Grade and property line stakes must show any offset measurements. <br />14. COORDINATION AND SUPERVISION: <br />The Developer shall provide supervision over and coordination among the various contractors working within the <br />development in order to prevent damage to Edison facilities. He is responsible for the cost of repairs, <br />replacement, relocation, or other corrections to Edison facilities made necessary by his failure to provide <br />supervision or to otherwise comply with these specifications. <br />15. TELEPHONE AND OTHER UTILITY REQUIREMENTS: <br />The drawing prepared for this job may also cover the facilities to be installed for the telephone company <br />and/or other utility. Any questions concerning details of their installation should be referred to the company <br />concerned. <br />16. OWNERSHIP: <br />Developer is to deed to the Edison Company all structures shown hereon except those shown as customer owned. <br />17. WARRANTY: <br />Applicants expressly represent and warrant that all work performed and all material used in meeting Applicants' <br />obligations herein are free from defects in workmanship and are in conformity with Southern California Edison <br />Companys requirements. This warranty shall commence upon receipt by Applicants of Companys final acceptance <br />and shall expire one year from that date. Applicants agree to promptly correct to the Company's satisfaction <br />and that of any governmental agency having jurisdiction and at Applicant's expense any breach of this warranty <br />which may become apparent through inspection or operation of underground electric system by Company during this <br />warranty period. <br />18. INSPECTION: <br />Inspection is required during the construction period. A 48 hour advance notice of intent to start construction <br />is required from the contractor to the Southern California Edison Company. Standards of Edison construction <br />requirements are available upon request. <br />Duct and Structure Inspector: FREDDY MARTINEZ Phone: 714 285-4374 <br />Cabling Construction Coordinator: FREDDY MARTINEZ Phone: 714 285-4374 <br />1(:F <br />TYPICAL CONDUIT BANK SECTION <br />SEE UGS CD 120 <br />z N <br />i <br />Io <br />1 1�„ <br />1 BEDDING <br />DIRECT BURIAL <br />SIMILAR CONSTRUCTION FOR FEWER CONDUIT <br />2 CONDUITS MAX. <br />REQUIR <br />WORKIN <br />NOTE: <br />ALL ELECTRICAL DUCTS AND STRUCTURES WILL <br />CONFORM TO GENERAL ORDER #128 (RULES FOR <br />CONSTRUCTION OF UNDERGROUND ELECTRICAL <br />SUPPLY AND COMMUNICATION PRESCRIBED BY THE <br />PUBLIC UTILITIES COMMISSION OF THE STATE <br />OF CALIFORNIA, JANUARY 2006). <br />CONNECTING TO EXISTING SCE STRUCTURES <br />• Per SCE requirements, customers are not allowed to enter, intercept or <br />tie-in to existing SCE facilities; e.g. structures, equipment, multi -conduit <br />runs/banks, or conductors. These facilities may be energized and the <br />work will only be performed by SCE. Contact the appropriate SCE <br />inspector to schedule an appointment. Customers may connect to an <br />existing conduit stub without a SCE inspector present. <br />• Multi -conduit runs/banks are runs of conduit in close proximity to each <br />other and other SCE facilities. A conduit stub is a single empty conduit <br />stub that is not in close proximity to other SCE owned facilities. Refer <br />to the work order map for details. <br />• Per CPUC/SCE's Rule 15 B.1.A and Rule 16 D.I.A., the customer will <br />provide all necessary excavations (with the exception of excavation under <br />pads and primary splice boxes), material (including conduit and <br />structures) and encasement, to be utilized in the intercept/tie-in <br />process. <br />• The customer must adhere to all applicable Cal -OSHA, local, city, state <br />and federal regulations, (including, but not limited to, all necessary <br />shoring and traffic control in place to perform the intercept/tie-in work <br />by SCE's underground civil contractor(s)). <br />• Intercept/tie-in work must be coordinated with SCE's civil contractors <br />through the Division Inspector/P-Spec to limit exposure of excavation(s). <br />Customer is responsible for securing excavation(s). <br />D08: 11/13/18 <br />TIE-IN MADE INTO A SECONDARY HANDHOLE <br />If PVC conduit is used, riser bend installation may <br />be made by the customer with prior SCE approval. <br />Customer not to remove handhole cover. If metallic <br />conduit is used or handhole cover needs to be removed, <br />a SCE Qualified Person must be present. <br />WARNING <br />THE EXCAVATOR MUST TAKE ALL STEPS NECESSARY TO AVOID <br />CONTACT WITH UNDERGROUND FACILITIES WHICH MAY RESULT IN <br />INJURY TO PERSONS OR DAMAGE TO FACILITIES IN THE AREA. <br />THE INDICATED LOCATIONS OF EDISON UNDERGROUND FACILITIES, <br />AS PROVIDED, ARE BELIEVED TO BE ACCURATE, HOWEVER, THE <br />FINAL DETERMINATION OF EXACT LOCATIONS AND THE COST OF <br />REPAIR TO DAMAGED FACILITIES IS THE RESPONSIBILITY OF THE <br />EXCAVATOR. <br />CUSTOMER -OWNED CONDUIT MATERIAL* AND CONCRETE <br />ENCASEMENT ARE TO BE INSTALLED IN ACCORDANCE WITH <br />EDISON ELECTRICAL SERVICE REQUIREMENTS. <br />*SUBJECT TO APPROVAL BY LOCAL INSPECTION AUTHORITIES <br />D14: G?;. :'�, <br />LEGEND CODE DEFINITIONS <br />Cl - CUSTOMER CONTRACTOR INSTALLED: MATERIALS FURNISHED AND <br />INSTALLED BY APPLICANT AT EDISON'S EXPENSE AND ARE DEEDED <br />TO EDISON. (EXCEPTION: STREET LIGHT ELECTROUERS WILL BE <br />INSTALLED BY EDISON'S CONTRACTOR.) <br />CO - CUSTOMER CONTRACTOR OWNED: MATERIALS FURNISHED. INSTALLED. <br />OWNED. AND MAINTAINED BY APPLICANT. <br />CF - CUSTOMER CONTRACTOR FURNISHED: MATERIALS FURNISHED AND <br />INSTALLED BY APPLICANT AT APPLICANT'S EXPENSE THAT MAY BE <br />DEEDED TO EDISON. <br />IN - INSTALL: MATERIALS FURNISHED AND INSTALLED BY APPLICANT IF <br />APPLICANT INSTALLED PROJECT OR BY EDISON IF EDISON INSTALLED <br />PROJECT. (EXCEPTION: FOR AN APPLICANT INSTALLED LINE EXTENSION. <br />STATION NOS. <br />HAVING AN ASTERISK ADJACENT TO AN "IN" LEGEND CODE REPRESENTS <br />MATERIALS TO BE PROVIDED BY APPLICANT AND INSTALLED BY EDISON <br />IN ALL CASES. REFER TO DPB 8258. PROJECT MATERIAL LIST BY <br />ASSEMBLY WITHIN A STATION.) <br />MI - MEMO INSTALL: SAME AS IN -INSTALL <br />MR - MEMO REMOVE: MATERIALS REMOVED BY EDISON. <br />RM - MEMO REMOVED: MATERIALS REMOVED BY EDISON. <br />SI - SHOOFLY IN: MATERIALS FURNISHED AND INSTALLED BY EDISON FOR <br />TEMPORARY CONSTRUCTION. <br />SR - SHOOFLY REMOVE: MATERIALS REMOVED BY EDISON FOR TEMPORARY <br />CONSTRUCTION. <br />TR - TRANSFER: EDISON LABOR REQUIRED TO TRANSFER EXISTING FACILITIES. <br />UNDERGROUND SERVICE ALERT <br />Contact USA <br />Dial 811 or 800-422-4133 <br />www.digalert.org/contact <br />For Underground Locating <br />Two Working Days Before You Dig <br />o F , <br />LEGEND OF CONDUIT SYMBOLS <br />(CONVENTIONAL U. G.) <br />EDISON <br />NO. CONDUIT REQ'D.so7E- <br />f SIZE OF CONDUIT <br />RUN NO. LENGTH OF CONDUIT RUN <br />TRENCH <br />TYPE OF FACILITY <br />(CIC-DB, ETC.) Do <br />RUN NO7E] f LENGTH OF TRENCH <br />STREET LIGHT <br />NO. CONDUIT REQ'D.� f SIZE OF CONDUIT <br />RUN NO. f LENGTH OF CONDUIT RUN <br />STREET LIGHT <br />TRENCH <br />TYPE OF FACILITY <br />RUN NO.� f LENGTH OF ADDITIONAL <br />TRENCH REQ'D. <br />EDISON <br />N0. CONDUIT REQ'D. SIZE OF CONDUIT <br />� REFERENCE RUN NO.MEMO DENOTES CONDUIT RUN CONTINUATION <br />FOR CONSTRUCTION INFORMATION <br />STREET LIGHT <br />NO. CONDUIT REQ'D. f SIZE OF CONDUIT <br />REFERENCE RUN NO.: MEMO f DENOTES CONDUIT RUN CONTINUATION <br />FOR CONSTRUCTION INFORMATION <br />ANY OF THE ABOVE SYMBOLS <br />FOLLOWED BY A <br />PANEL CLEARANCE <br />UNDERGROUND SERVICE CONNECTIONS 0-600 VOLTS <br />SEE ESR 3-16 <br />SIDE VIEW <br />DENOTES THE FOLLOWING: <br />DB CONDUIT WITHOUT ENCASEMENT IS <br />ACCEPTABLE FOR PORTIONS OF TRENCH <br />WITH ONLY ONE OR TWO CONDUITS <br />SEMI -ENCASEMENT IS REQUIRED FOR <br />PORTIONS OF TRENCH WITH ONLY <br />THREE OR FOUR CONDUITS <br />FULL ENCASEMENT IS REQUIRED FOR <br />MORE THAN FOUR CONDUITS <br />NOTES: <br />1. A MINIMUM OF THREE (3) FEET OF CLEAR, LEVEL WORK SPACE IS REQUIRED IN FRONT OF ALL TERMINATION, METERING, AND SERVICE <br />EQUIPMENT. <br />2. SEE ESR-5 FOR <br />WORKING SPACE METER - THE MOUNTINGCENTERLINHEIGHT <br />THE MEREQUIREMENTS. METER MOUNTING HEIGHT WILL BE MEASURED FROM THE STANDING AND <br />3. WHEN SERVICE EQUIPMENT IS INSTALLED ON AN ELEVATED PORTION OF THE FLOOR/GROUND, OR HOUSEKEEEPING PAD, THE PAD SHALL BE <br />FLUSH WITH AND EXTEND A MINIMUM OF THREE (3) FEET. THIS IS MEASURED FROM THE FRONT OF THE SERVICE EQUIPMENT OR THE OUTER <br />DOOR(S) OF THE SWITCHBOARD NEMA 3R ENCLOSURE WHEN INSTALLED. IN NO CASE SHALL THE MAXIMUM METER HEIGHT OF SIX (6) FEET <br />THREE (3) INCHES BE EXCEEDED. <br />4. TO MAINTAIN A SAFE, CLEAR, AND LEVEL WORKING AREA IN FRONT OF NEW OR EXISTING METER AND SERVICE EQUIPMENT, A CONCRETE SLAB <br />OR OTHER SUITABLE PERMANENT HARD SURFACE, ACCEPTABLE TO THE COMPANY, MUST BE USED. <br />5, FOR SWITCHBOARDS ABOVE 60OV, FIVE-FOOT MINIMUM OF CLEAR AND LEVEL STANDING AND WORKING SPACE IS REQUIRED IN THE FRONT, <br />REAR, AND SIDE OF ANY SECTION WHERE SUCH PART SUPPORTS OR PROVIDES ACCESS TO METERING, TESTING EQUIPMENT, OR SERVICE <br />CABLE TERMINATION SECTIONS. <br />16.12 PROTECTIVE BARRIERS FOR SERVICE EQUIPMENT <br />BARRIER POSTS ARE USED TO PROTECT THE METER AND SERVICE EQUIPMENT, AS WELL AS PERSONNEL, <br />FROM VEHICULAR CONTACT, AND TO PROHIBIT ENCROACHMENT INTO THE WORKING SPACE. <br />(FOR EXAMPLE: LOADING ZONES, DRIVEWAYS, CONGESTED AREAS, OFF STREET PARKING, AND SO ON). <br />THE CUSTOMER SHALL PROVIDE AND INSTALL "NON -REMOVABLE" BARRIERS TO PROVIDE THE PROPER SAFE <br />WORKING CLEARANCES WHERE THE WORKSPACE IS EXPOSED TO VEHICULAR OR OTHER HAZARDOUS CONDITIONS. <br />METERS WILL NOT BE SET UNTIL THE BARRIERS HAVE BEEN INSTALLED. <br />EXISTING SINGLE LINE 1-28-2024 <br />BISMUTH 12KV % CAMDEN B1 <br />0 P� RM 25KVA 120/240 1P <br />O <br />B5077653 <br />-14 <br />Gov <br />P5074968 <br />0897E 111A GP <br />P5074562 �^ B5077654 \ <br />aoo <br />AO B5077655 OG B5077652 <br />B AB A ;0 \� <br />136314 P5073899 �.� L <br />1200 <br />80894E P5073898 <br />(01 Y I �PJ <br />P5073897 I m g��� <br />3893 B5077651 <br />m I HAB 'B5077656 <br />894 _ 00�� <br />B5077461 ��` B5077460 <br />I I ./• 3 <br />P5073896 I I �Ps • 4444590E <br />1130007E <br />V.� <br />ALLJ B 0563 <br />P5073895 4444589E P5074499 <br />4752179E LOAD BREAK N <br />11� JG <br />1130004E �S5539998 <br />4444588E <br />P5074968 AFL r, <br />i80897E� � GP <br />P5074562 �- B5077654 <br />..-Ell1 <br />3900 AiAO <br />LOR�;titi� <br />17"00" 00" FRP <br />IN:1-6W BAR 1P <br />PROPOSED SINGLE LINE <br />BISMUTH 12KV % CAMDEN 61 <br />N 50KVA 120/240 f <br />1 B5077653 <br />-Po <br />N� <br />B5077655 O B5077652 <br />B AB P5073899 �. <br />A % <br />J036314 <br />_ I •` <br />1680894E P5073898 <br />01 < <br />P5073897 I m <br />73893 i B5077651 <br />• F <br />B B5077656 <br />r3894 OG� <br />B5077461 �� 65077460 <br />P5073896 .�•/ 4444590E <br />I I ./ 1130007E <br />PS <br />A B V 0563 <br />P5073895 4444589E P5074499 <br />4752179E LOAD BREAK N <br />�G <br />� Flo <br />G. & -,.-- -- <� orronnno <br />SN: <br />CR: <br />1 - <br />S HH PLAS 13"X24"X15" <br />RM: <br />4 - <br />CNN BAR INS LT DUTY #8-350 1P 4-WAY <br />IN: <br />1 - <br />TR UG BT MC DE 50KVA 6.9KV 120/240 1P+ <br />SN: <br />Cl: <br />1 - <br />S HH FIBER 17X30X30 SEC/PRI CIC REPL CBL <br />Cl: <br />1 - <br />SS TAX EXCV CST FOR BD/PAD/PB/PME/SB/SOE <br />IN: <br />4 - <br />CNN BAR INS LT DUTY #8-350 1P 6-WAY <br />CF: <br />152 <br />- CM DUCT 2 1 /2" TO 4" <br />CF: <br />152' <br />- CM DUCT FOR EXCAVATION <br />IN: <br />152' <br />- CBL 2-1/0 1-2 AL 3-1/C 600V CLP PLEX <br />MI: <br />30' <br />- CBL 2-1/0 1-2 AL 3-1/C 600V CLP PLEX <br />IN: <br />1 - <br />MTR KWH 30A 120/240 1P 3W <br />CREW NOTES: <br />-VEHICULAR TRAFFIC CONTROL REQUIRED - CATTCH DWG#9 <br />-PEDESTRIAN TRAFFIC CONTROL REQUIRED - ROUTE #4 <br />-INSTALL 3/C 2-1/0 & 1-#2 PLEX CABLE FROM HH TO NEW PEDESTAL <br />-REPLACE 25KVA WITH A 50KVA XFMR IN BURD B5077653 <br />-REPLACE UTILCO BARS IN BURD B5077653 WITH 6-WAY UTILCO BARS <br />-REPLACE HANDHOLE AND UTILCO BARS WITH 6-WAY UTILCO BARS <br />-INSTALL 900 METER FOR THE NEW PEDESTAL ® 2902 3/4 S ROSEWOOD SANTA ANA <br />-SOURCE XFMR STR# B5077653 <br />CUSTOMER NOTES: <br />-CUSTOMER TO INSTALL 3" CONDUIT FROM HH TO NEW PEDESTAL <br />-CUSTOMER TO INSTALL NEW PEDESTAL ® 12902 3/4 S ROSEWOOD SANTA ANA <br />CONTACT INFO: <br />SCE PLANNER - <br />NAME: SANDEEP TALLURI <br />PHONE: 657-212-0095 <br />CUSTOMERISITE CONTACT: <br />NAME. STEVE PEREZ <br />PHONE- 714-647-5612 <br />SCE Inspection <br />Contact SGE 48 Hours in advance for a <br />Pre -Construction meeting andror Inspection. <br />SCE INSPECTOR - <br />NAME - FREDDY MARTINEZ <br />PHONE: 714-285-4374 <br />SOUTHERN CALIFORNIA <br />EDISON <br />An EDISON INTERNATIONAL Company <br />SCALE: 1 " = 40' <br />PROJECT REQUIREMENTS <br />(Y/N� <br />EDISON EASEMENT REQUIRED <br />0 <br />PWRD 88 REQUIRED <br />0 <br />UG CIVIL ONLY WORK ORDER <br />0 <br />PERMIT REQUIRED <br />0 <br />PERMIT TYPE: TRAFFIC CONTROL <br />OUTAGE REQUIRED <br />❑Y <br />OUTAGE DATE: TIME: <br />TRAFFIC CONTROL REQUIRED <br />❑Y <br />PED. TRAFFIC CONTROL REQ'D <br />❑Y <br />CONVEYANCE LETTER REQ'D <br />❑N <br />ENVIRONMENTAL REQUIREMENTS <br />❑ <br />DOCUMENT (ERD) REQUIRED <br />CSD 140 (TLM) REQ'D <br />❑Y <br />CIRCUIT MAP CHANGE REQ'D (TD 203) <br />❑N <br />DIG ALERT APP <br />❑Y <br />VERIFIED ACTIVE AND <br />❑ <br />CONFIRMED USA TICKETS <br />UTILIQUEST NOTIFIED <br />❑ <br />STANDARD ADHERENCE: 4 Q/ 2023 Y <br />C_'USTOMER MAI� <br />FINAL DESIGN <br />APPROVED / • CONSTRUCTION <br />0 40 80 <br />