My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />TABLE OF CONTENTS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />SPECIFICATIONS <br />Part I - General Provisions <br />Section1 - General....................................................................................................................... 1 <br />Section2 - Scope of the Work..................................................................................................... 4 <br />Section 3 - Control of the Work................................................................................................... 7 <br />Section 4 - Control of Materials.................................................................................................12 <br />Section 5 - Legal Relations and Responsibilities.......................................................................12 <br />Section 6 - Prosecutionand Progress of the Work......................................................................17 <br />Section 7 - Measurement and Payment......................................................................................18 <br />Section 8 - Facilities for City Personnel.........................................................................Not <br />Used <br />Section 9 - Claims Resolution Procedures................................................................................. 20 <br />Part 4 - Existing Improvements <br />Section402 - Utilities................................................................................................................ 25 <br />Part 6 - Temporary Traffic Control <br />Section600 - Access.................................................................................................................. 25 <br />Section 601 - Temporary Traffic Control for Construction and Maintenance Work Zones...... 27 <br />1.00 Special Provisions -Construction <br />1.01 <br />Rock Products................................................................................................................ 28 <br />1.02 <br />Relative Compaction Tests............................................................................................ <br />28 <br />1.03 <br />Clearing and Grubbing...................................................................................................28 <br />1.04 <br />Unclassified Excavation.................................................................................................28 <br />1.05 <br />Subgrade Preparation..................................................................................................... <br />29 <br />1.06 <br />Cold Milling...................................................................................................................29 <br />1.07 <br />Slurry Seal Surfacing..................................................................................................... <br />29 <br />1.08 <br />Asphalt Concrete............................................................................................................31 <br />1.09 <br />Pavement Fabric............................................................................................................. <br />33 <br />1.10 <br />Asphalt Rubber Hot Mix (ARHM)................................................................................ <br />34 <br />1.11 <br />Crack Repair and Patching............................................................................................. <br />34 <br />1.12 <br />Portland Cement Concrete (PCC).................................................................................. <br />34 <br />1.13 <br />Concrete Curbs, Gutters, Walks, Ramps, Driveway Approaches, Alley Aprons, and <br />CrossGutters..................................................................................................................35 <br />1.14 <br />Portland Cement Concrete (PCC) Grinding................................................................... <br />36 <br />1.15 <br />Portland Cement Concrete (PCC) Pavement Construction ............................................ <br />36 <br />1.16 <br />Landscaping and Irrigation Repair................................................................................. <br />38 <br />1.17 <br />Root Shaving..................................................................................................................38 <br />1.18 <br />Adjustment of Surface Utilities to Grade.......................................................................38 <br />1.19 <br />Pulverize & Cement -Treat Existing Asphalt Concrete, Base, and Subgrade <br />....Not Used <br />1.20 <br />Remove Excess Pulverized Material..................................................................Not <br />Used <br />1.21 <br />Cold In -Place Recycling (CIR) / Cold Central Plant Recycling (CCPR) ..........Not <br />Used <br />1.22 <br />Cold In -Place Recycling Expanded Asphalt Mix (CIREAM) ...........................Not <br />Used <br />1.23 <br />Asphalt -Rubber Cape Seal............................................................................................. <br />40 <br />ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.