My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />*Pothole Utilities not shown on plans <br />10 <br />EA <br />$ <br />$ <br />15 <br />*Unclassified Excavation <br />1,100 <br />CY <br />$ <br />$ <br />16 <br />*AC Pavement <br />145 <br />TN <br />$ <br />$ <br />17 <br />PCC Sidewalk (T=4") <br />800 <br />SF <br />$ <br />$ <br />18 <br />PCC Median 4" Stamped Concrete <br />410 <br />SF <br />$ <br />$ <br />19 <br />PCC Curb (Type B-1) <br />110 <br />LF <br />$ <br />$ <br />20 <br />PCC Curb and Gutter (Type A-2-8) <br />100 <br />LF <br />$ <br />$ <br />21 <br />PCC Cross -Gutter (Local Street) <br />1,200 <br />SF <br />$ <br />$ <br />22 <br />PCC Modified Retaining Curb <br />80 <br />LF <br />$ <br />$ <br />23 <br />PCC Modified Retaining Curb (Double) <br />20 <br />LF <br />$ <br />$ <br />24 <br />PCC Curb Ramp <br />500 <br />SF <br />$ <br />$ <br />25 <br />Install Liner along existing 10" VCP <br />Sewer Pipe <br />170 <br />LF <br />$ <br />$ <br />26 <br />CCTV Inspection of Existing Sewer Main <br />and Laterals (Pre and Post Construction) <br />1 <br />LS <br />$ <br />$ <br />27 <br />(By -Pass) Temporary Above Ground <br />Sewer Line with Backup Pumps and <br />Tractor Truck <br />1 <br />LS <br />$ <br />$ <br />28 <br />Pedestrian Barricade <br />50 <br />LF <br />$ <br />$ <br />29 <br />Project Advertising Sign(s) <br />2 <br />EA <br />$ <br />$ <br />30 <br />Construction Permit <br />1 <br />LS <br />$5,500 <br />$ <br />P-2 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.