My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 09 - Fairview Street Improvement Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
02/04/2025
>
Item 09 - Fairview Street Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 10:45:12 AM
Creation date
1/29/2025 10:37:42 AM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Analysis Supporting Categorical Exemption <br /> Construction-generated emissions associated the Proposed Project are calculated using the CARB- <br /> approved CalEEMod computer program,which is designed to model emissions for land use development <br /> projects, based on typical construction requirements. <br /> Predicted maximum daily con struction-generated emissions for the Proposed Project are summarized in <br /> Table 3. Construction-generated emissions are short-term and of temporary duration, lasting only as long <br /> as construction activities occur, but are considered a significant air quality impact if the volume of <br /> pollutants generated exceeds the SCAQMD's thresholds of significance. <br /> Table 3. Construction-Related Emissions (Regional Significance Analysis) <br /> Pollutant (pounds per day) <br /> Construction Year <br /> ROG NOx CO S02 PM10 PM2.5 <br /> Construction Calendar Year One 3.84 33.00 39.20 0.07 5.77 1.89 <br /> Construction Calendar Year Two 1.88 16.00 21.00 0.04 2.57 0.82 <br /> SCAQMD Regional Significance Threshold 75 700 550 750 750 55 <br /> Exceed SCAQMD Regional Threshold? No No No No No No <br /> Source:CaIEEMod version 2022.1. Refer to Attachment A for Model Data Outputs. <br /> Notes: Emissions taken from the season,summer or winter,with the highest outputs. <br /> As shown in Table 3, emissions generated during Project construction would not exceed the SCAQMD's <br /> regional thresholds of significance. Therefore, criteria pollutant emissions generated during Project <br /> construction would not result in a cumulatively considerable net increase of any criteria pollutant for <br /> which the Project region is nonattainment under an applicable federal or state ambient air quality <br /> standard, and no health effects from Project criteria pollutants would occur. <br /> Localized Construction Significance Analysis <br /> In order to identify localized,air toxic-related impacts to sensitive receptors, the SCAQMD recommends <br /> addressing LSTs for construction. LSTs were developed in response to SCAQMD Governing Boards' <br /> Environmental Justice Enhancement Initiative(1-4).The SCAQMD provided the Final Localized Significance <br /> Threshold Methodology(dated June 2003 [revised 2008]) for guidance.The LST methodology assists lead <br /> agencies in analyzing localized impacts associated with Project-specific level proposed projects. <br /> For this Project, the appropriate SRA for the localized significance thresholds is the Central Orange <br /> County, SRA 17. LSTs apply to CO, NO2, PMio, and PM2.5. As previously described, the SCAQMD has <br /> produced lookup tables for projectsthat disturb one,two and five acres.The Project spans approximately <br /> 4 acres. Thus, the LST threshold values for a five-acre site were used. <br /> ECORP Consulting, Inc. 9 January 2025 <br /> Fairview Street Widening Project 2024-088.03 <br /> 9-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.