Laserfiche WebLink
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> 2.00 SPECIAL PROVISIONS -TRAFFIC SIGNING& STRIPING <br /> 2.01 SCOPE OF WORK <br /> The work to be done consists, in general, removal and installation of signs, posts, raised <br /> pavement markers, stripes, pavement markings and curb markings as shown on the plans <br /> and as described below. Items or details not specifically mentioned in the following Sub- <br /> Sections that are required by the project plans, in the applicable 2018 Caltrans Standard <br /> Specifications, 2018 Caltrans Standard Plans, City of Santa Ana Standard Plans, Standard <br /> Specifications for Public Works Construction (SSPWC) or these Special Provisions shall <br /> be performed, constructed or installed. <br /> 2.02 STRIPING(TRAFFIC STRIPES AND PAVEMENT MARKINGS) <br /> This Section shall conform to the latest City of Santa Ana Standard Plans, the Caltrans <br /> Standard Plans,provisions in Section 84 of the Caltrans Standard Specifications, and these <br /> Special Provisions. <br /> A. GENERAL <br /> All traffic stripes,crosswalks,limit lines and pavement markings shall be thermoplastic <br /> ALKYD BINDER, except for temporary striping, crosswalks and limit lines. <br /> All green bikeway markings shall be Methyl Methacrylate (MMA). MMA shall have <br /> skid resistance and be approved equal to Ennis-Flint CycleGrip MMAX or Transpo <br /> ViziGrip and comply with FHWA requirements.The application of MMA shall comply <br /> and be in strict adherence to manufacturer's installation instructions and <br /> recommendations. <br /> All curb markings and median island markings shall be painted using Environmental <br /> Protection Agency(EPA) compliant paint material. Paint shall be fast or rapid dry type <br /> solvent of similar or approved equal to that manufactured by Ennis or Pervo Paint <br /> Companies and shall meet all requirements of South Coast Air Quality Management <br /> District. The rate of paint to be applied shall be per recommendation of the paint <br /> manufacturer. <br /> All pavement markings including legends, arrows, and symbols shall be per Caltrans <br /> Standard Plan A24A- A24E. <br /> All crosswalks at signalized intersections with wheelchair ramps shall be striped with <br /> a 5' diagonal (45°) cut-off at the curb return, as shown in City of Santa Ana Standard <br /> Plans No. 1130. Crosswalk stripes shall be 12 inches wide. <br /> All STOP legends and limit lines at stop controlled intersections shall be installed, as <br /> shown in City of Santa Ana Standard Plans No. 1505. Limit Line stripes shall be 12 <br /> inches wide. <br /> 42 <br />