My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> 3.02 PROJECT PHASING AND LANE REQUIREMENTS NOT USED <br /> 3.03 ADVANCED WARNING SIGNS <br /> A. CHANGEABLE MESSAGE SIGNS (CMS) <br /> The Contractor shall provide 2 solar powered CMS two weeks prior to commencement <br /> of construction. The signs shall be posted in advance of each end of the project for the <br /> duration of the project. These CMS can be LED full matrix or letter matrix or <br /> equivalent, with preferred 8" letter (minimum 6"). The overall width of the sign <br /> including the trailer shall not exceed 8'. <br /> • Prior to the start of the construction, display the following message: <br /> Screen 1: <PROJECT STREET NAME> CONSTR <br /> Screen 2: BEGINS xx/xx/xx <br /> • When construction started, display the following message: <br /> Screen 1: <PROJECT STREET NAME>UNDER CONSTR <br /> Screen 2: USE ALT ROUTE <br /> The messages and sign location may be changed at any time as determined by the <br /> Engineer. <br /> B. STATIC WARNING SIGNS <br /> The Contractor shall post 2 static advance warning signs at least two weeks prior to <br /> commencement of construction stating: <br /> MAJOR ROAD CONSTRUCTION ON <br /> <PROJECT STREET NAME> <br /> FROM<DATE>TO <DATE> <br /> EXPECT DELAYS <br /> USE ALTERNATE ROUTE <br /> The signs shall be posted in advanced of each end of the project. These warning signs <br /> shall be sized (5' height by 6'wide minimum) to fit the above wordings with orange <br /> reflective background, black border and 7" black letters. If sign is installed on the <br /> sidewalk, there shall be enough clearance for pedestrian access underneath the sign. <br /> The Engineer will determine sign placement and the dates. <br /> In the event of construction delays that go beyond the posted completion date on the <br /> sign, the contractor shall keep the completion date on the sign updated on a monthly <br /> basis or as directed by the Engineer. <br /> 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.