My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> The contractor shall provide traffic control as required and approved by the agency having <br /> jurisdiction. Under no circumstances shall the abandonment take place before existing <br /> sewers and manholes are out of service and all flow directed to the new or alternate pipes. <br /> The manhole wall shall be removed to 18-inches below finished surface and be completely <br /> removed and properly disposed of,unless otherwise shown. <br /> The manhole base shall be perforated or cored through and filled with sand (SE 30 <br /> minimum). <br /> The manhole rim and cover shall be salvaged and delivered to the City of Santa Ana Water <br /> Resources Division at 215 S. Center Street. <br /> Existing pipe ends within manholes to be abandoned shall be plugged with concrete and <br /> bricks per section 306-5. Concrete shall be Class C and bricks shall be a manhole brick as <br /> specified in Section 202-1 of the Standard Specifications. <br /> The contractor shall remove and replace all asphalt, concrete pavement, earthwork, <br /> landscaping, or other surface damaged by the abandonment operations per an in <br /> conformance with these provisions. <br /> 6.15 CONSTRUCT 4" OR 6" HIGH DENSITY POLYETHYLENE (HDPE) SEWER <br /> LATERALS AND CLEANOUTS (PIPE BURST) <br /> This work involves the installation of HDPE Pipe. Method of construction shall be via <br /> trenchless pipe replacement installations. <br /> The Contractor shall connect to the new sewer main and to the existing sewer lateral pipe <br /> at the property line. The existing sewer lateral shall be depicted on the construction plans <br /> based on the best information available. It is the Contractor's responsibility to "locate <br /> all points of connection for each new sewer lateral at both ends: the wye at the public <br /> sewer main and the private connection point at property line where lateral cleanout <br /> will be constructed." The Contractor shall insert a push camera with sounder/locator up <br /> the lateral from the main (insertion pit) to mark and locate the point of connection at the <br /> property line. All locations points shall be marked in the field prior to installation and <br /> construction of new sewer lateral. <br /> Underground conduit construction shall conform to all applicable Subsections of Section <br /> 306 and Section 500 of the Standard Specifications, the Standard Plans and these Special <br /> Provisions. <br /> High density polyethylene pipe in accordance with these specifications shall be used in <br /> pipe bursting or trenchless pipe replacement installations. <br /> 100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.