My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> 6. Sample of proposed backfill material(approximate one gallon bag) <br /> Sewer manhole structures shall be in conformance with all City of Santa Ana Standard <br /> Plans, the Standard Specifications, and these Special Provisions and not limited to the <br /> following manufacturer information: <br /> 1. Sewer Manhole Structure- Material composition, frame and cover <br /> 2. Terminal Cleanout Structure-Material composition, frame and cover <br /> 3. Sewer Flow Monitoring and Alarming Device <br /> Sewer laterals shall be in conformance with all City of Santa Ana Standard Plans, the <br /> Standard Specifications, and these Special Provisions and not limited to the following <br /> manufacturer information: <br /> 1. SDR-26 PVC pipe, VCP pipe, HDPE pipe, and or other as approved by the <br /> Engineer <br /> 2. Cleanout Structure-Material composition, frame and cover <br /> 3. Fittings <br /> 4. Adapters/Repair Couplings/Gaskets <br /> 7.00 SPECIAL PROVISIONS -WATER MAIN IMPROVEMENTS NOT USED <br /> 8.00 SPECIAL PROVISIONS - STORM DRAIN CONSTRUCTION NOT USED <br /> 9.00 SPECIAL PROVISIONS -ELECTRICAL SYSTEM NOT USED <br /> 10.00 SPECIAL PROVISIONS -BRIDGE CONSTRUCTION NOT USED <br /> 11.00 SPECIAL PROVISIONS -MISCELLANEOUS CONSTRUCTION <br /> 11.01 CIPP LINER PIPE <br /> This This work shall include installing 6", 8", 10" and 12" diameter cured-in-place(CIPP) <br /> liner pipe into an existing 6", 8", 10" or 12" diameter V.C.P. sewer main. All work and <br /> materials shall conform to section 500-5.5 of the Standard Specifications. The CIPP Liner <br /> Pipe shall comply with Type "A"or Type "B"of the Standard Specifications. <br /> Neither the CIPP Liner Pipe system, nor its installation, shall cause adverse effects to any <br /> of the City's processes or facilities. The use of the product shall not result in the formation <br /> or production of any detrimental compounds or by-products at the Orange County <br /> 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.