My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> The installed CIPP shall be continuous over the entire length of a sewer line section and be <br /> free from visual defects such as foreign inclusions,dry spots,pinholes,major wrinldes and <br /> de-lamination. The lining shall be impervious and free of any leakage from the pipe to the <br /> surrounding ground or from the ground to inside the lined pipe. <br /> The beginning and end of the CIPP shall be sealed to the existing host pipe. The sealing <br /> material shall be compatible with the pipe end and shall provide a watertight seal. <br /> A seal,consisting of a resin mixture or hydrophilic seal compatible with the installed CIPP <br /> shall be applied at manhole walls in accordance with the CIPP System manufacturer's <br /> recommendations. <br /> The installed CIPP Liner Pipe shall have a long term(50 year) corrosion resistance to the <br /> typical chemicals found in sanitary sewage. <br /> Submittals shall include the following: <br /> 1. Fabric Tube—including the manufacturer and description of product components. <br /> 2. Flexible membrane (coating) material — including recommended repair (patching) <br /> procedure if applicable. <br /> 3. Raw Resin Data—including the manufacturer and description of product components. <br /> 4. Manufacturers' shipping, storage and handling recommendations for all components of <br /> the CIPP Liner Pipe system. <br /> 5. All MSDS sheets for all materials are to be furnished for the project. <br /> 6.Tube wet-out and cure method—this shall include a complete description of the proposed <br /> wet-out procedure for the proposed technology, the manufacturer's recommended cure <br /> method for each diameter and thickness of CIPP Liner Pipe to be installed and contain a <br /> detailed curing procedure with the curing medium and method of application. <br /> If sewer by-passing is deemed necessary, it shall be the Contractor's responsibility to <br /> provide the necessary equipment to handle the flow without sewage backup occurring to <br /> facilities connected to the sewer. Sewer by-passing shall conform to section 500-4.3 of the <br /> Standard Specifications. <br /> The materials used for the project shall be certified by the manufacturer for the specified <br /> purpose. manufacturer shall warrant the liner to be free from defects in raw materials <br /> The <br /> for one (1) year from the date of installation and acceptance by the City. The Contractor <br /> shall warrant the liner installation for a period of one (1) year. During the Contractor <br /> warranty period any defect, which may materially affect the integrity, strength, function <br /> and/or operation of the pipe, shall be repaired at the Contractor's expense. <br /> 114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.