Laserfiche WebLink
CITY OF SANTA ANA <br /> TABLE OF CONTENTS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> SECTION/ITEM PAGE <br /> 4.33 Closed Circuit Television(CCTV) System 82 <br /> 4.34 IP Communication System 83 <br /> 4.35 Payment 83 <br /> 5.00 Special Provisions-Irrigation,Landscaping, &Maintenance Period Not Used <br /> 6.00 Special Provisions-Sanitary Sewer Improvements <br /> 6.01 Open Trench Operations,Excavation, Bedding, and Backfill 85 <br /> 6.02 Import Backfill Material 87 <br /> 6.03 Existing Utilities and Adjustments in Grade 87 <br /> 6.04 Landscaping and Irrigation Repair 87 <br /> 6.05 Portland Cement Concrete(PCC) Cross Gutter 88 <br /> 6.06 Temporary Paving(When Trenching in PCC Streets) 88 <br /> 6.07 Permanent Asphalt Concrete Trench Pavement Replacement 88 <br /> 6.08 Permanent Portland Cement Concrete (PCC)Trench Pavement and Bus Pad <br /> Replacement 89 <br /> 6.09 Vitrified Clay Pipe(VCP) Sewer Main 92 <br /> 6.10 Polyvinyl Chloride (PVC) Sewer Pipe 94 <br /> 6.11 New Manhole Structures 97 <br /> 6.12 Remove Existing Manhole Structures 99 <br /> 6.13 Abandon Existing Sewer Main 99 <br /> 6.14 Abandon Existing Manhole Structures 99 <br /> 6.15 Construct 4" or 6" High Density Polyethylene (HDPE) Sewer Laterals and Cleanouts <br /> (Pipe Burst) 100 <br /> 6.16 Construct 4" or 6"Polyvinyl Chloride (PVC) Sewer Laterals and Cleanouts (Open <br /> Trench) 103 <br /> 6.17 Connect Sewer Laterals 105 <br /> 6.18 Closed Circuit Television(CCTV) Inspection of Sewer Main and Laterals 105 <br /> 6.19 Sewer Flow Level Monitoring &Alarming Device 107 <br /> 6.20 Repair Couplings 107 <br /> 6.21 Sewer Flow Bypassing 107 <br /> 6.22 Submittals 110 <br /> ZOO Special Provisions- Water Main Improvements Not Used <br /> 8.00 Special Provisions-Storm Drain Construction Not Used <br /> 9.00 Special Provisions-Electrical System Not Used <br /> 10.00 Special Provisions-Bridge Construction Not Used <br /> 11.00 Special Provisions-Miscellaneous Construction <br /> 11.01 CIPP Liner Pipe 111 <br /> iv <br />