Laserfiche WebLink
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> Notifications: <br /> Prior to the start of construction operations, the Contractor shall notify the Police and Fire <br /> Departments of the AGENCY,giving the approximate starting date,completion date,and the name <br /> and telephone number of responsible persons who may be contacted at any hour in the event of a <br /> critical condition requiring immediate correction. At least two weeks prior to starting work, the <br /> Contractor shall notify the Orange County Transportation Authority (OCTA) bus service of the <br /> approximate starting date and completion date. <br /> Construction Notices: <br /> At least two weeks prior to starting work, the Contractor shall deliver notices supplied by the <br /> AGENCY to the residents and businesses in the area affected by the construction. At least 48 hours <br /> before working on a street, the contractor shall contact the residents and businesses of that street by <br /> written notice to provide information as to the type of work, closure, type of inconvenience and the <br /> expected duration.The written notice shall be a tag shape similar to the sample shown in the Appendix <br /> of the Contract Documents and be hung on door knobs and all parked vehicles on the street. In the <br /> event of a delay after the notice has been delivered, the contractor shall provide an updated notice to <br /> the residents and businesses. After construction completion on the street, the contractor shall collect <br /> any notices that are not picked up by the resident or business. <br /> Temporary Construction Signs: <br /> Contractor shall furnish, install and maintain temporary construction signs as detailed in the <br /> Appendix of the Contract Documents. The signs shall be mounted on Type II barricades and <br /> secured with sandbags to prevent overturning. The contractor shall install the temporary <br /> construction signs during construction at locations approved by the Engineer. The maintenance <br /> includes, but is not limited to the relocation for the different construction phases, replacement(if <br /> damaged due to the operations of the Contractor) and graffiti removal. <br /> Temporary Parking Removal Signs: <br /> The signs for temporary parking removal during construction shall be a minimum of 12" x 18" as <br /> shown in the Appendix of the Contract Documents. The signs shall be posted 48 hours prior to the <br /> temporary parking removal. A sign shall be posted at the beginning of the parking removal area, the <br /> beginning of every block, and every 100 -150 feet thereafter. <br /> Payment for notifications, construction notices, temporary construction signs, and temporary <br /> parking removal signs shall be included in the other items of work and no additional compensation <br /> will be allowed therefore,and shall include all labor and materials necessary to manufacture, install <br /> and maintain the signs and barricades. <br /> 26 <br />