My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> The Sand Equivalent requirement of Section 200-1.5.3 shall be replaced with the <br /> following: <br /> Tests Test Method Requirements <br /> Sand Equivalent Calif. 217 <br /> Individual Test 70 min.* <br /> Moving Average 75 min.* <br /> * For 2500 or less class concrete, except concrete pavement, a minimum 65 <br /> Individual Test Result and a minimum 70 Moving Average will be acceptable if 2500 psi <br /> 28-day strength criteria of Section 201-1.1.4 are met, at a six (6)inch slump or greater. <br /> Evaluation of Sand Equivalent and Cleanness Value results shall conform to the provisions <br /> of Subsections 200-1.4 and 200-1.5. <br /> All cement to be used or furnished on this Project shall be Type II low alkaline Portland <br /> cement conforming to ASTM C150. <br /> 1.13 CONCRETE CURBS, GUTTERS, WALKS, RAMPS, DRIVEWAY APPROACHES, <br /> ALLEY APRONS, AND CROSS GUTTERS <br /> This Section shall conform to Sections 201, 303 and 400 of the Standard Specifications <br /> and these Special Provisions. <br /> Curbs and/or gutters to be constructed shall match existing in all dimensions and shall <br /> conform to City of Santa Ana Standard Plan No. 1101. Reconstructed curb and gutters <br /> shall be constructed so the top of curb matches the sidewalk surface elevation. When the <br /> plans do not show replacement limit stations, the Engineer shall approve replacement <br /> limits. Prior to acceptance of the curb and gutter construction by the Engineer, a flow test <br /> shall be conducted by the Contractor in the presence of the Engineer. <br /> Curb depressions for driveway approaches and sidewalk thickness across driveway shall <br /> be in accordance with City of Santa Ana Standard Plan No. 1112 in lieu of dimensions <br /> indicated in Section 303-5.1.3 of the Standard Specifications. <br /> Alley and alley apron shall conform to City of Santa Ana Standard Plan No. 1111. <br /> All culvert openings encountered when replacing curb and gutter shall be reconstructed per <br /> City of Santa Ana Standard Plan No. 318 or 319. <br /> During construction of driveway approaches, the Contractor shall maintain access to each <br /> business at all times. In some cases, construction of one-half of a driveway approach at a <br /> time may be required.The construction of the driveway approach shall encompass the curb <br /> and gutter situated in front of the driveway, unless there is a continuous replacement of <br /> curb and gutter on both sides of the driveway approach. In such cases, the curb and gutter <br /> improvements shall be incorporated into the curb and gutter item. <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.