|
EQUIPMENT LIST
<br />METHOD $/TEST
<br />Type B Joint Seals (Caltrans SS 51-2) ...................................................1,640
<br />Bearing plates (A536) ...............................................................................770
<br />REINFORCING STEEL AND PRESTRESSING STRANDS
<br />Rebar tensile test, ≤ up to No. 11 (ASTM A370)..........................................70
<br />Rebar tensile test, ≥ No. 14 & over (ASTM A370)......................................215
<br />Rebar bend test, up to No. 11 (ASTM A370) ...............................................70
<br />Rebar bend test, ≥ No. 14 & over (ASTM A370) ........................................215
<br />Resistance butt-welded hoops/bars, tensile test, ≤ up to No. 10 (CTM
<br />670) .........................................................................................................70
<br />Resistance butt-welded hoops/bars, tensile test, ≥ No. 11 & over
<br />(CTM 670).....................................................................................................90
<br />Mechanical rebar splice, tensile test, ≤ up to No. 11 (CTM 670) ...............70
<br />Mechanical rebar splice, slip test, ≤ up to No. 11 (CTM 670) .....................45
<br />Mechanical rebar splice, tensile test, ≥ No. 14 & over (CTM 670) ...........215
<br />Mechanical rebar splice, slip test, ≥ No. 14 & over (CTM 670) .................215
<br />Headed rebar splice, tensile test, ≤ up to No. 11 (CTM 670) .....................70
<br />Headed rebar splice, tensile test, ≥ No. 14 & over (CTM 670) .................215
<br />Epoxy coated rebar/dowel film thickness (coating) test (ASTM A775/
<br />A934) .......................................................................................................50
<br />Epoxy coated rebar/dowel continuity (Holiday) test
<br /> (ASTM A775/A934) ...................................................................................70
<br />Epoxy coated rebar flexibility/bend test, up to No. 11
<br /> (ASTM A775/A934) ....................................................................................50
<br />Prestressing wire, tension (ASTM A416) ..................................................190
<br />Sample preparation (cutting) ...................................................................55
<br />METHOD $/TEST
<br />STREET LIGHTS/SIGNALS
<br />LED Luminaires / Signal Modules / Countdown Pedestrian Signal Face
<br />Modules (Caltrans RSS 86) ................................................................1,390
<br />SPRAY APPLIED FIREPROOFING
<br />Unit weight (density, ASTM E605) ..............................................................65
<br />FASTENERS / BOLTS / RODS
<br />F3125 GR A307, A325 Bolts, tensile test, ≤ up to 1-1/4” diameter, plain
<br />(ASTM A370) ............................................................................................70
<br />F3125 GR A307, A325 Bolts, tensile test, ≤ up to 1-1/4” diameter,
<br /> galvanized (ASTM A370) .........................................................................80
<br />A490 Bolts, tensile test, ≤ up to 1-1/4” diameter, plain (ASTM A370) .......70
<br />A490 Bolts, tensile test, ≤ up to 1-1/4” diameter, galvanized
<br />(ASTM A370) ................................................................................................80
<br />A593 Bolts, tensile test, ≤ up to 1-1/4” diameter, stainless steel (ASTM
<br />A370) ........................................................................................................70
<br />F1554 Bolts, tensile test, ≤ up to 1-1/4” diameter, plain (ASTM A370) ...110
<br />F1554 Bolts, tensile test, ≤ up to 1-1/4” diameter, galvanized (
<br />ASTM A370) ..........................................................................................130
<br />SAMPLE TRANSPORT
<br />Pick-up and delivery (weekdays, per trip,
<br /> <50 mile radius from our office) .......................................................110
<br />ITEM $ UNIT
<br />1/4 inch Grab plates ............................................................................5 each
<br />1/4 inch Tubing (bonded) ..............................................................0.60 foot
<br />1/4 inch Tubing (single) ..................................................................0.40 foot
<br />3/8 inch Tubing, clear vinyl ...........................................................0.60 foot
<br />4-Gas meter (RKI Eagle or similar)/GEM 2000 ................................140 day
<br />Air flow meter and purge pump (200 cc/min) ..................................55 day
<br />Box of 24 soil drive-sample rings ....................................................130 box
<br />Brass sample tubes ...........................................................................11 each
<br />Caution tape (1000-foot roll) ............................................................22 each
<br />Combination lock or padlock ...........................................................15 each
<br />Compressed air tank and regulator ..................................................55 day
<br />Concrete coring machine (≤6-inch-dia) ..........................................160 day
<br />Consumables (gloves, rope, soap, tape, etc.) ..................................40 day
<br />Core sample boxes ............................................................................30 each
<br />Crack monitor Two-Dimensional......................................................30 each
<br />Crack monitor Thee-Dimensional ....................................................40 each
<br />Cutoff saws, reciprocating, electric (Sawzall®) ................................80 day
<br />D-Meter Walking Floor Profiler .......................................................110 day
<br />Disposable bailers .............................................................................25 each
<br />Disposable bladders .........................................................................20 each
<br />Dissolved oxygen meter ....................................................................50 day
<br />DOT 55-gallon containment drum with lid ......................................85 drum
<br />Double-ring infiltrometer ................................................................135 day
<br />Dual-stage interface probe ...............................................................85 day
<br />Dynamic Cone Penetrometer .........................................................430 day
<br />Generator, portable gasoline fueled, 3,500 watts ............................90 day
<br />Global Positioning System/Laser Range Finder ...............................80 day
<br />Hand auger set ..................................................................................90 day
<br />HDPE safety fence (≤100 feet) ...........................................................40 roll
<br />Horiba U-51 water quality meter ....................................................135 day
<br />Light tower (towable vertical mast) ...............................................150 day
<br />Magnehelic gauge .............................................................................15 day
<br />Manometer ........................................................................................25 day
<br />Mileage (will adjust with IRS published rate) ................................0.67 mile
<br />ITEM $ UNIT
<br />Moisture test kit (excludes labor to perform test, ASTM E1907) .....65 test
<br />Nuclear moisture and density gauge ...............................................88 day
<br />Electrical moisture and density gauge ............................................88 Day
<br />Pachometer .......................................................................................50 day
<br />Particulate Monitor .........................................................................135 day
<br />pH/Conductivity/Temperature meter ..............................................60 day
<br />Photo-Ionization Detector (PID) .....................................................130 day
<br />Pump, Typhoon 2 or 4 stage .............................................................55 day
<br />QED bladder pump w/QED control box ..........................................175 day
<br />Quire fee – Phase I only ...................................................................250 each
<br />Resistivity field meter and pins ......................................................200 day
<br />Slip / threaded cap, 2-inch or 4-inch diameter, PVC Schedule 40 ...20 each
<br />Slope inclinometer ..........................................................................250 day
<br />Soil sampling T-handle (Encore).......................................................10 day
<br />Soil sampling tripod ..........................................................................40 day
<br />Speedy (R) moisture tester ...............................................................10 day
<br />Stainless steel bailer..........................................................................60 day
<br />Submersible pump with controller ................................................180 day
<br />Submersible pump/transfer pump, 10-25 gpm ...............................65 day
<br />Support service truck usage (well installation, etc.) .....................250 day
<br />Survey/fence stakes ..........................................................................10 each
<br />Tedlar® bags ......................................................................................25 each
<br />Traffic cones (≤25)/barricades (single lane) .....................................55 day
<br />Turbidity meter .................................................................................80 day
<br />Tyvek® suit (each) ..............................................................................25 each
<br />Vapor sampling box...........................................................................65 day
<br />Vehicle usage (carrying equipment).................................................20 hour
<br />VelociCalc ..........................................................................................40 day
<br />Visqueen (20 x 100 feet) ..................................................................130 roll
<br />Water level indicator (electronic well sounder) <300 feet deep well 100 day
<br />ZIPLEVEL®...........................................................................................40 day
<br />Other specialized geotechnical and environmental testing and
<br />monitoring equipment are available, and priced per site
<br />Fee 2024 www.verdantas.com Page 3 of 4
<br />FEE SCHEDULE
|