My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Agreements for On-Call Water Resources Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
02/18/2025
>
Item 14 - Agreements for On-Call Water Resources Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2025 3:39:41 PM
Creation date
2/12/2025 10:46:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
2/18/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AIRX Utility Surveyors, Inc. <br />PREVAILING WAGE RATE SHEET <br />July 22, 2024 <br />Pricing on this document is valid for 90 days from the date above. <br />Prepared For: Company Name Attn: Contact Name, Phone Number <br />Project Name: Project Name, City of Project <br />Project Location: Example: 16061 Avenida Venusto @ 18" RCP SD Tie-In <br />Total Number of Estimated Potholes:0 <br />Project Management & Report Preparation <br />Project Management (USA Mark-Out / Standby Coord. / Pothole Layout) <br />Report drafting <br />Prevailing Wage Processing (Apprentice Reporting and Certified Payroll) <br />Specialty Training <br />No.: <br />No.: <br />No.: <br />No.: <br />0 hours @ <br />0 hours @ <br />0 hours @ <br />0 hours @ <br />$165 per hour= <br />$125 per hour= <br />$125 per hour= <br />$140 per hour= <br />Sub-total <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />Potholing <br />Potholing Daily Rate (2-man crew) <br />^^includes shoulder closure or narrow lane closure, backfill and AC cold patch <br />Third Laborer for Hot Patch Cap <br />Mobilization (portal-to-portal) <br />Potholing 1-Man / 1-Vacuum Truck Hourly Rate <br />No.:0 @ $4,000 per day=$0 <br />No.: <br />No.: <br />No.: <br />No.: <br />No.: <br />0 <br />0 <br />0 <br />0 <br />0 <br />@ <br />@ <br />@ <br />@ <br />@ <br />$1,600 per day= <br />$400 per hour= <br />$275 per hour= <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />Manhole Dips <br />Haulage and Dump Fee (Non-Hazardous only) <br />$100 each= <br />$350 per load= <br />Sub-total <br />Wet & Dry Utility Locating <br />Locating - 1 Man & Equipment (Elec, Mag, Sonic, GPR) <br />Locating - CCTV Truck and 2 Crew <br />No.: <br />No.: <br />0 hours @ <br />0 hours @ <br />$205 per man hour= <br />$410 per man hour= <br />Sub-total <br />$0 <br />$0 <br />$0 <br />Traffic Control <br />Traffic Control/ROW plans - 11"X17" <br />Permit processing <br />Minimal Traffic Control Equipment (w/CCTV only) <br />Bike Lane, Shoulder or Narrow Lane Closure (Excludes Arrow Board) <br />Small Intersections/Standard Lane Closures (Up to 500' + tapers) <br />No.: <br />No.: <br />No.: <br />No.: <br />No.: <br />No.: <br />No.: <br />No.: <br />0 <br />0 @ $175 p/sheet= <br />$120 per hour= <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />0 hours @ <br />0 each @ <br />0 each @ <br />0 each @ <br />0 each @ <br />0 days @ <br />0 nights @ <br />$145 per hour for <br />$150 <br />$350 <br />$550 <br />$750 <br />each= <br />each= <br />each= <br />each=Large Intersections/Multiple Lane Closures <br />Additional Arrow Board <br />Night Work Premium <br />$150 per day= <br />$350 per night= <br />Certified Flagman / Addt'l Laborer No. Flagmen 0 hours= <br />Sub-total <br />Concrete and Asphalt Patching <br />Aquaphalt Permanent Patch w/Saw Cut <br />AC Hot Mix Patch w/Saw Cut (Crew of 2) <br />AC Hot Mix Patch Grind and Overlay (Crew of 4) <br />Coring - 12" Diameter <br />No.: <br />No.: <br />No.: <br />No.: <br />No.: <br />0 <br />0 <br />0 <br />0 <br />0 <br />@ <br />@ <br />@ <br />@ <br />$150 <br />$3,500 per day= <br />$6,500 per day= <br />each=$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$130 <br />Call for Quote <br />each= <br />Sidewalk Panel Replacement <br />Sub-total $0 <br />Estimate Total:$0.00 <br />XBD2024 <br />Initials <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.