Laserfiche WebLink
<br />STATEMENT OF STANDARD CHARGES <br />Technical / Engineering Services <br />Calendar Year 2025 <br />LABOR RATES: <br />Labor Rate <br />(Technical/Engineering)Classification <br />President $295/hr <br />$250/hr <br />$200/hr <br />$175/hr <br />$150/hr <br />$100/hr <br />Principal Engineer / Scientist <br />Senior Engineer / Scientist <br />Engineer / Scientist <br />Associate Engineer / Scientist <br />Administrative Assistant <br />PROJECT-RELATED EXPENSES: <br />All project-specific non-labor costs and expenses are billed at cost plus 10% Administrative Cost. <br />Example project-specific non-labor costs are subcontractors, outside printing services, equipment, <br />and supplies. No travel costs will be billed to the District. General business costs, such as postage, <br />computer, and telecommunications are part of the business overhead cost and not billed separately. <br />WATER QUALITY & TREATMENT SOLUTIONS, INC. <br />Issam Najm, Ph.D., P.E. <br />President <br />21018 Osborne Street, Ste. 1; Canoga Park, CA 91304; T: 818-435-4500; F: 818-484-3100 ; www.WQTS.com