My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Cooperative Agreement Regarding First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
02/18/2025
>
Item 15 - Cooperative Agreement Regarding First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2025 3:07:40 PM
Creation date
2/12/2025 10:47:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
2/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The First Street Boulevard Multimodal Study Project will look at <br />options to enhance the City’s planned improvements for First Street <br />by assessing the feasibility of infrastructure improvements through <br />robust community outreach efforts and field data analyses. <br />PROJECT NEED: <br />As per the approved GP update, First Street is envisioned to go from a <br />6-vehicle travel lane, divided roadway to a 4-vehicle travel lane divided <br />roadway with bicycle infrastructure and enhanced pedestrian <br />sidewalks. These potential improvements will benefit the Santa Ana <br />residents who utilize OCTA’s Route 64, one of the highest ridership <br />bus routes in Orange County. Route 64 services Orange County bus <br />riders from Westminster Mall, to the west, to Larwin Square Shopping <br />Mall, to the east, in Tustin while traversing right through the heart of the <br />City of Santa Ana on First Street. The route consists of approximately <br />90 stops covering both directions with nearly 50 of them in Santa Ana. <br />PROJECT TITLE: <br />First Street Multimodal Boulevard <br />Study Project <br />PROJECT CATEGORY: <br />Traffic Improvements <br />Traffic Improvements <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works Traffic Engineering Ruben Castaneda, Senior Engineer 21-Jan-2025 <br />PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction 3,870,000 ------ <br />Engineering 430,000 ------ <br />TOTAL 4,300,000 ------ <br />SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />ATP 4,300,000 ------ <br />TOTAL 4,300,000 ------ <br />EXHIBIT 3
The URL can be used to link to this page
Your browser does not support the video tag.