Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Project Warner Ave to Saint Andrew Place (Phase IV) <br />TABLE 7 CO HOTSPOT ANALYSIS (PPM) <br />As discussed previously, the proposed project would not result in air pollutant concentrations that exceed the <br />SCAQMD's Localized Significance Thresholds for construction activities. In addition, the operations phase of <br />the project would not result in CO hotspots. As such, the constriction and operations phases of the project <br />would not result in significant impacts to air quality which would expose sensitive receptors to substantial air <br />pollutant concentrations. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />e) Create objectionable odors affecting a substantial number of people? <br />Construction activities associated with the proposed Project may generate detectable odors from heavy- duty <br />construction equipment and exhaust. Odors associated with diesel and gasoline fumes are transitory in nature <br />and would not create objectionable odors affecting a substantial number of people. The impacts from these <br />odors would be short -tern, would cease upon project completion and are not anticipated to be significant. <br />Implementation of the proposed Project would not result in greater impacts than previously analyzed in the <br />1990 Final EIS /EIR. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />ANA 305 -194 (PER 02) CSA (AUGUST 2014) 133867 YU 31 <br />75C -47 <br />WE <br />Bristol Street and Warner Avenue` <br />Northeast Receptor 6.8 20 4.6 9.0 No No <br />Southeast Receptor 6.9 20 4.7 9.0 No No <br />Southwest Receptor 6.9 20 4.7 9.0 No No <br />Northwest Receptor 6.9 20 4.7 9.0 No No <br />Bristol Street and Glenwood Place <br />Northeast Receptor 6.5 20 4.4 9.0 No No <br />Southeast Receptor 6.5 20 4.4 9.0 No No <br />Southwest Receptor 6.6 20 4.5 9.0 No No <br />Northwest Receptor 6.6 20 4.5 9.0 No No <br />Bristol Street and St. Andrew Place <br />Northeast Receptor 6.4 20 4.3 9.0 No No <br />Southeast Receptor 6.4 20 4.3 9.0 No No <br />Southwest Receptor 6.5 20 4.4 9.0 No No <br />Northwest Receptor 6.5 20 4.4 9.0 No No <br />Bristol Street and St„Andrew Place <br />Northeast Receptor 7.1 20 4.8 9.0 No No <br />Southeast Receptor 7.1 20 4.8 9.0 No No <br />Southwest Receptor 7.2 20 4.9 9.0 No No <br />Northwest Receptor 7.1 20 4.8 9.0 No No <br />Source: URS Corporation, January 2012. <br />As discussed previously, the proposed project would not result in air pollutant concentrations that exceed the <br />SCAQMD's Localized Significance Thresholds for construction activities. In addition, the operations phase of <br />the project would not result in CO hotspots. As such, the constriction and operations phases of the project <br />would not result in significant impacts to air quality which would expose sensitive receptors to substantial air <br />pollutant concentrations. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />e) Create objectionable odors affecting a substantial number of people? <br />Construction activities associated with the proposed Project may generate detectable odors from heavy- duty <br />construction equipment and exhaust. Odors associated with diesel and gasoline fumes are transitory in nature <br />and would not create objectionable odors affecting a substantial number of people. The impacts from these <br />odors would be short -tern, would cease upon project completion and are not anticipated to be significant. <br />Implementation of the proposed Project would not result in greater impacts than previously analyzed in the <br />1990 Final EIS /EIR. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />ANA 305 -194 (PER 02) CSA (AUGUST 2014) 133867 YU 31 <br />75C -47 <br />  <br />  <br />City Council 17 – 186 3/4/2025