My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-03-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025 Regular
>
Agenda Packet_2025-03-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 9:36:18 AM
Creation date
2/26/2025 9:31:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
3/4/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FY 24/25 FY 27/28 FY 28/29 FY 29/30 <br />22,354,493 --- <br />2,235,449 --- <br />405,560 --- <br />2,398,370 --- <br />27,393,872 --- <br />FY 24/25 FY 27/28 FY 28/29 FY 29/30 <br />748,415 --- <br />632,183 --- <br />680,000 --- <br />1,611,810 --- <br />11,910,023 --- <br />1,596,614 --- <br />2,535,113 --- <br />770,440 --- <br />672,108 --- <br />3,173,750 --- <br />27,393,872 --- <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Jason Gabriel, Principal Civil Engineer 4-Mar-2025 <br />TOTAL --- <br />WATER CAPITAL --- <br />TSIA AREA F --- <br />TSIA AREA E --- <br />RMRA SB1 --- <br />- <br />RESIDENTIAL STREET IMPROV --- <br />-----OCTA BRISTOL ST CORRIDOR 3,063,416 <br />MEASURE M2 COMPETITIVE --- <br />M2 LOCAL FAIRSHARE --- <br />GENERAL FUND --- <br />GAS TAX --- <br />DAF: DA-IV --- <br />SOURCE OF FUNDS FY 25/26 FY 26/27 FY 30/31 <br />TOTAL --- <br />Engineering --- <br />Other --- <br />PROJECT COSTS FY 25/26 FY 26/27 FY 30/31 <br />Construction --- <br />Contingency --- <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The Bristol Street Improvements project was planned and designed to <br />incorporate complete street concepts with storm water quality features. The <br />improvements include widening of the street from four lanes to six lanes, <br />with bus turnouts, raised median, bike lanes, enhanced storm drain system, <br />and sound walls. The project also brings native and organic landscaping <br />that beautifies a fully developed urban area. <br />PROJECT NEED: <br />Bristol Street from Warner Avenue to St. Andrew Place (Phase 4) is part of the <br />City's plan to widen Bristol Street from Warner Avenue to Memory Lane, which <br />was approved by City Council in 1990 and reevaluated in 2015. Existing <br />roadway has only 2 lanes in each direction and is operating at a Level of <br />Service (LOS) F. This widening is needed to improve traffic flow and create <br />complete streets features. <br />PROJECT TITLE: <br />Bristol St Impr & Widening: Ph 4 - <br />Warner - St Andrew <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & Widening <br />LOCATION MAP <br />EXHIBIT 8 <br /> <br /> <br />City Council 17 – 234 3/4/2025
The URL can be used to link to this page
Your browser does not support the video tag.