My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:03:32 PM
Creation date
2/26/2025 9:36:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
3/4/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL. IMPACT REPORTADDENDUM <br />Bristol Street Widening Project Warner Ave to Saint Andrew Place (Phase IV) <br />2.0 ENVIRONMENTAL CHECKLIST <br />2.1 Background <br />Project Title: <br />Bristol Street Widening Phase IV Project, <br />Lead Agency Name and Address: <br />City of Santa Ana <br />20 Civic Center Plaza, M-36 <br />Santa Ana, CA 92702 <br />Contact Person and Phone Number: <br />Kenny Nguyen, P.E. Senior Civil Engineer City of Santa Ana (714) 647-5632 <br />Project Location: <br />Bristol Street from Warner Avenue to Saint Andrew Place in the City of Santa Ana. <br />Project Sponsor's Name and Address: <br />City of Santa Ana <br />20 Civic Center Plaza, M-36 <br />Santa Ana, CA 92702 <br />General Plan Designation: <br />General Commercial (GC), Low Density Residential (LR-7), Open Space (OS), Park with Commercial <br />(P/C) <br />Zoning: <br />Specific Plan (SPl), General Commercial (C-2), Single Family Residential (R1), Two Family Residential <br />(R2) <br />Description of Project: <br />The City of Santa Ana is proposing to widen the Bristol Street between Warner Avenue and Saint Andrew <br />Place as part of the previously approved Bristol Street from Warner Avenue to Memory Lane Project, for <br />which an EIS/EIR was certified in 1990. <br />The Build Alternative involves the widening of Bristol Street (between Warner Avenue to Saint Andrew <br />Place) from 4 lanes to 6 lanes with a 150-foot wide right-of-way cross section including a 14-foot wide <br />raised landscaped median; 3 12-foot wide through travel lanes in each direction; a 7-foot wide Class II bike <br />lane on each side of the roadway; a 15-foot wide parkway, and 10-foot sidewalk with curb ramps for <br />wheelchair access pursuant to ADA requirements on both sides of the roadway. <br />As Bristol Street approaches the intersections between Warner Avenue and Saint Andrew Place, and <br />between Warner Avenue and Glenwood Place, the landscaped center median would taper to accommodate <br />right -turn pockets and left -turn lanes in each direction. The landscaped center median would then continue <br />north of the Glenwood Place intersection to snatch the existing raised center median approximately 380 feet <br />south of Edinger Avenue. The addition of the landscaped center median would improve safety by preventing <br />left -turn access to/from Saint Gertrude Place, Saint Anne Place, Camden Place, and Carlton Place to the <br />newly widened Bristol Street. (Note: the intersection of Bristol Street and Saint Andrew Place would be <br />converted to a right -turn only intersection in both directions.) Additionally, cul-de-sacs would be included <br />on the west side of Bristol Street at Saint Anne Place, Camden Place, and Carlton Place to improve safety by <br />preventing access to/from these streets to the newly widened Bristol Street. <br />ANA 305-194 (PER 02) CSA (AUGUST 2014) 133867 YU 19 <br />75C-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.