My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:03:32 PM
Creation date
2/26/2025 9:36:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
3/4/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Project Warner Ave to Saint Andrew Place (Phase IV) <br />accurately determine the significance of air quality impacts from construction activities, construction emissions <br />are quantified and compared to the significance thresholds set by the SCAQMD. Project -specific data, such as <br />construction timelines and dimensions of the project site, along with general operating guidelines, were used as <br />inputs to the SCAQMD's California Emissions Estimator Model (CalEEMod) Model (version 2011.1.1) to <br />quantify construction emissions. As shown in Table 3, emissions calculated by this model were compared to the <br />SCAQMD's regional significance thresholds. <br />As shown in Table 3, emissions attributable to construction of the proposed project were found to be below the <br />significance thresholds adopted by the SCAQMD for all the analyzed air pollutants. Because emissions were <br />found to be below the SCAQMD's significance thresholds, project related construction emissions are not <br />considered by the SCAQMD to result in a significant impact. In addition, mitigation measures included in the <br />1990 Final EIS/EIR would further reduce construction -related air quality impacts. <br />TABLE 3 PROJECT RELATED CONSTRUCTION EMISSIONS <br />C121T1=RlA FOLLIJTAM(S <br />�L�B� lf}AY� j <br />vOC <br />NOx <br />CO ' <br />SO2 <br />PM10 <br />PM2s5 <br />Demolition <br />8 <br />64 <br />43 <br /><1 <br />12 <br />3 <br />Trenching <br />4 <br />33 <br />19 <br /><1 <br />2 <br />2 <br />Grading <br />7 <br />52 <br />31 <br /><1 <br />5 <br />4 <br />Paving <br />3 <br />15 <br />11 <br /><1 <br />1 <br />1 <br />Maximum <br />8 <br />64 <br />43 <br /><1 <br />12 <br />3 <br />SCAQMD Threshold <br />75 <br />100 <br />550 <br />150 <br />150 <br />55 <br />Exceeds Threshold? <br />No <br />No <br />No <br />No <br />No <br />No <br />Source: URS Corporation, January 2011 <br />An assessment of regional emissions associated with the operations phase of the proposed project was also <br />conducted which compared emissions with and without the proposed project. Air pollutant emissions generated <br />by roadway vehicles are quantified based on emissions rates that vary based on vehicle speed. Because the <br />Proposed Project would increase the roadway capacity along Bristol Street, traffic congestion would be <br />alleviated and average vehicle speeds would increase along improved roadway segments. Table <br />4 shows the emissions that would occur with and without the proposed Project based on the average vehicle <br />speeds. As shown in Table 4, air pollutant emissions would be less under the With Project Alternative as <br />opposed to the No Project Alternative due to the lower emission rates associated with higher average vehicle <br />speeds. The SCAQMD has established significance thresholds to determine whether the operations phase of <br />projects would result in significant impacts to regional air quality. The proposed project would result in air <br />pollutant emissions which are below these significance thresholds and would result in a beneficial impact in <br />emissions due to improvements in operational phase efficiencies along project roadway segments for the 2015 <br />project opening year. <br />Emissions occurring during the 2035 design year were also quantified based on the LOS, average vehicle speed <br />and emission rates that would occur with and without the proposed project. As shown in Table 5, air polhrtant <br />emissions occurring under the With Project Alternative would be less than under the No Project Alternative due <br />to lower emission rates associated with higher average speeds. Consequently, the Proposed Project for the 2035 <br />ANA 305-194 (PER 02) CSA (AUGUST 2014) 133867 YU 25 <br />75C-41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.