My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Item 17 - Appropriation Adjustments for Bristol Improvement Project Phase 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:03:32 PM
Creation date
2/26/2025 9:36:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
3/4/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br />Modified Initial Study Checklist <br />The following Modified Initial Study (MIS) Checklist is based on the California Environmental Quality Act (CEQA) <br />Initial Study Checklist. It is modified to evaluate the proposed project changes for which environmental impact <br />reports/statements have previously been completed to assist in the determination of the need for supplemental <br />environmental documents, in this case, a Supplemental EIS/1IR or an Addendum under Public Resources Code <br />21166 and Guideline Sections 15162, 15163, and 15164. For purposes of this study, references to "the proposal" in <br />the left hand column questions refer to the proposed project changes. <br />The first four columns to the right of the MIS questions identify whether the proposed project changes would result <br />in new impacts and if so whether these impacts would be less than significant, less than significant after mitigation, <br />or significant. <br />The fifth cohunn asks whether or not the impacts associated with project changes, if any, were sufficiently disclosed <br />in the previous environmental documents (Not Addressed). <br />Finally, the last column indicates whether or not a Supplemental EIS/EIR is needed. A Supplemental EIS/EIR would <br />be needed if there were new significant iuimitigated or substantially more severe impacts which would result from <br />the project changes and which were not sufficiently disclosed in the previous environmental documents. <br />Discussion in support of the conclusions indicated on the checklist is provided in Chapter 3. <br />ANA 345-194 (PER 42) CSA (AUGUST 2014) 133967 YU 75r-76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.