My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
89-125
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1989
>
89-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:32:15 PM
Creation date
6/26/2003 10:46:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
89-125
Date
12/4/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~mergency access shall be provided (to the <br />satisfaction of the ?ire Department) prior to the <br />placement of combustibles on-site. <br /> <br />Fire hydrants shall be in operating order prior to <br />placement of combustibles on-site. <br /> <br />the <br /> <br />Prior to approval of Certificate of Occupancy: <br /> <br />Phase I & Phase II <br /> <br />Develop a Transportation Demand Management (TDM) Plan <br />to be approved by the Public Works Agency in <br />compliance with TDM program outlined on pages 46 thru <br />49 of the Traffic Study.. <br /> <br />Verify compliance with items number 1 through 20 of <br />Section A. <br /> <br />Phase I <br /> <br />Widen the east side of Tustin Avenue adjacent to the <br />project site to provide for an additional lane as a <br />future right' turn lane at Seventeenth Street per <br />approved plans. <br /> <br />Restripe Tustin Avenue to accommodate dual left turn <br />lanes southbound into the project driveway. <br /> <br />Install a bus bay and bus shelter on the east side of <br />Tustin Avenue just northerly of the project driveway <br />in accordance with OCTD design standards. <br /> <br />Install the proposed traffic signal on Tustin Avenue <br />per approved plans. ~ <br /> <br />Construct extended raised landscaped median with left <br />turn pocket in Tustin Avenue Southerly of project <br />driveway. <br /> <br />Reconstruct new storm drain and manholes per approved <br />plan. <br /> <br />Pay any difference of a Transportation System <br />Improvement fee increase from the fee rate collected <br />at time of release of Building Permit. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.