My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
106. (14) <br /> <br />107. (15) <br /> <br />108. (16) <br /> <br />109. (17) <br /> <br />All monthly parking shall be via keycard. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Prior to operation <br /> <br />Inspection; plan check review; <br />operations plan; CC&Rs <br /> <br />Case Planner; Engineering <br />Services; Supervisor of <br />Inspections, Building Division <br /> <br />All visitor parking shall be controlled with a machine-issued ticket. <br /> <br />Timin~ of Implementation/Verification Prior to operation <br /> <br />Method of Verification Inspection; plan check review; <br /> operations plan; CC&Rs <br /> <br />Responsible Parties Case Planner; Engineering <br /> Services; Supervisor of <br /> Inspections, Building Division <br /> <br />All residential parking entry shall be via radio wave units, issued to residences. Inter- <br />coms and instructions shall be installed at all residential gates to allow visitors to <br />contact residents. <br /> <br />Timing of Implementation/Verification Prior to operation <br /> <br />Method of Verification Inspection; plan check review; <br /> operations plan; CC&Rs <br /> <br />Responsible Parties Case Planner; Engineering <br /> Services; Supervisor of <br /> Inspections, Building Division <br /> <br />Intercom units will be provided at pedestrian gates to allow visitors who park in visitor <br />spaces located outside the security gates to contact residents for entries. <br /> <br />Timing of Implementation/Verification <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Prior to operation <br /> <br />Inspection; plan check review; <br />operations plan; CC&Rs <br /> <br />Case Planner; Engineering <br />Services; Supervisor of <br />Inspections, Building Division <br /> <br />383 <br /> <br />IR3/S:11340001 .MM A-47 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.