Laserfiche WebLink
PUBLIC UTILITIES <br /> <br />ELECTRICITY <br /> <br />144. (1) <br /> <br />The applicant shall submit electrical plans to SCE and coordinate with SCE any system <br />modifications that may be needed to serve the project. <br /> <br />Timing of Implementation/Verification <br /> <br />Plan check <br /> <br />Method of Verification <br /> <br />Review <br /> <br />Responsible Parties <br /> <br />Case Planner, Planning Division; <br />Senior Plan Check Engineer, <br />Building Division; and <br />Engineering Services Manager, <br />Development Engineering <br />Division <br /> <br />145. (2) <br /> <br />The applicant shall coordinate with Southern California Edison to incorporate energy <br />savings programs into the construction and operation of the Main Street Concourse <br />project. Incorporation of these programs and energy savings technologies in the design <br />and operation of the project will contribute to overall regional reduction in long-term <br />energy needs. <br /> <br />Timing of Implementation/Verification <br /> <br />Plan check <br /> <br />Method of Verification <br /> <br />Review <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator, and <br />Case Planner, Planning Division; <br />Senior Plan Check Engineer, <br />Building Division; and <br />Engineering Services Manager, <br />Development Engineering <br />Division <br /> <br />NATURAL GAS <br /> <br />146. (1) <br /> <br />The project shall be required to meet the energy building regulations adopted by the <br />California Energy Commission (Title 24) and the City as part of the building permit <br />procedure. <br /> <br />Timing of Implementation/Verification <br /> <br />Plan check <br /> <br />Method of Verification <br /> <br />Review <br /> <br />Responsible Parties <br /> <br />Case Planner, Planning Division; <br />and Engineering Services <br />Manager, Development <br />Engineering Division <br /> <br />JB3/S:11340001 .MM A-62 <br /> <br /> <br />