My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AESTHETICS <br /> <br />153. (1) A landscaping plan for the project must be approved by the Planning Division prior to <br /> <br /> 54. (2) <br /> <br />project implementation. <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check <br /> <br />Plan check review <br /> <br />Landscape Associate, Case <br />Planner, and Environmental <br />Coordinator, Planning Division <br /> <br />Aesthetic design features shall be integrated into architectural plans to make it <br />compatible with the surrounding environment, and to add visual interest to structures. <br /> <br />155. (3) <br /> <br />156. (4) <br /> <br />157. (5) <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check <br /> <br />Plan Check review/Inspection <br /> <br />Case Planner, Planning Division <br /> <br />Landscape, accent, and safety lighting shall be Iow-level, with appropriate brightness <br />matched to use to minimize glare. (See MMP Nos. 42-46 and MMP Nos. 130-134) <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check <br /> <br />Plan Cbeck Review/Inspection <br /> <br />Case Planner, Landscape <br />Associate, Planning Division <br /> <br />All roof and mechanical eqnipment, garbage dumpsters, and other equipment shall be <br /> <br />screened from view by design. <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check <br /> <br />Plan Check Review/Inspection <br /> <br />Case Planner and Environmental <br />Coordinator, Planning Division <br /> <br />The proposed project will be subject to a review by the City of Santa Ana Planning <br />Division to ensure the City's design goals and objectives are met. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsihle Parties <br /> <br />Plan check; construction <br /> <br />Plan Check Review/Inspection <br /> <br />Case Planner, Phmning Division <br /> <br />403 <br /> <br />1B3/S: t 1340001 .MM A-67 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.