Laserfiche WebLink
99. (7) <br /> <br />lOO. (8) <br /> <br />101. (9) <br /> <br />'381 <br /> <br />Upon operation of Phase I, a comprehensive validation program will be instituted by <br />the property management and the manager of parking operations. <br /> <br />Timing of Imolem_e_ntation/Verification <br /> <br />Prior to operation of Phase I <br /> <br />Method of Verification <br /> <br />Parking operator's contract; <br />CC&Rs <br /> <br />Responsible Parries <br /> <br />Case Planner; Engineering <br />Division; Property Manager and <br />Manager of Parking Operations <br /> <br />A 2-hour free validated parking period shall be provided to retail visitors. <br /> <br />Timing of Implementation/Verification <br />Method of Verification <br /> <br />Prior to operation of Phase I <br /> <br />Parking operator's contract; <br />CC&Rs <br /> <br />Responsible Parties <br /> <br />Case Planner; Engineering <br />Division; Manager Parking <br />Operations <br /> <br />All parking areas shall have 90 degree stalls with two-way traffic on all drive aisles. <br /> <br />Timing of Implementation/Verification <br /> <br />Method of Verification <br /> <br />Responsible Parties <br /> <br />Plan check, prior to issuance of <br />building permit <br /> <br />Review of working drawings and <br />inspection <br /> <br />Case Planner, Planning Division <br /> <br />JBMS:II3400OlMM A-43 <br /> <br /> <br />