My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:01 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-23
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Method of Verification <br /> <br />Copy of canceled checks <br /> <br />Responsible Parties <br /> <br />Environmental Coordinator. Planning <br />Division; Project Sponsor or <br />representative; Tustin Unified School <br />District; Senior Plan Check Engineer, <br />Building Division <br /> <br />Water <br /> <br />69. <br /> <br />Water conservation and management techniques shall be incorporated into the design, <br />construction and operation of the project including the installation of fixtures that use <br />reduced volumes of water, landscaping irrigation in early morning or evening hours to <br />reduce water lost to evaporation and use of drought tolerant plant species for new <br />landscaping. <br /> <br />Timin~ of lmnlementation/Verification <br /> <br />Plan check; during construction <br /> <br />Method of Verification <br /> <br />Review and inspection of landscape <br />plan <br /> <br />Responsible Parties <br /> <br />Landscape Associate Planning <br />Division; Water Resources Manager, <br />Water Resources Division <br /> <br />70. <br /> <br />The City of Santa Ana Fire Department will determine the precise fire flow requirements <br />from the proposed project during its review of the final project plan. The design and <br />implementation of any required on-site improvement to provide the fire flow requirement, <br />such as the proposed loop water system, determined during site plan review will be borne <br />by the project sponsor. <br /> <br />Timing of ImplementationFqerification <br /> <br />Han check <br /> <br />Method of Verification <br /> <br />Review and inspection <br /> <br />Resnonsible Parties <br /> <br />Fire Marshall, Fire Deparanent; <br />Engineering Services Manager, <br />Engineering Division: Water <br />Resources Manager, Water <br />Resources Division; Project Sponsor <br />or representative <br /> <br />Sewer <br /> <br />71. <br /> <br />Site planning and final design for the project shall be coordinated with the Orange County <br />Sanitation Districts (OCSD). All requirements of the OCSD and the City shall be <br />incorporated into the final design of the project. <br /> <br />Timin~ of lmolementafionfVefification <br /> -26- <br /> <br />Plan check <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.