Laserfiche WebLink
6 ~, ~ESOLUTION 954)22 <br /> <br />22) <br /> <br />Over 10 and not over 50 HP, KW, <br />KVA each <br /> <br />Over 50 and not over 100 HP, KW <br />KVA each <br /> <br />Over 100 and not over 500 HP, <br />KVA each <br />Over 500 HP, KW, KVA each <br /> <br />KW, <br /> <br />Inspections outside of normal <br />business hours (4 hour minimum charge <br />for Holidays, Saturday or Sunday <br />inspections) <br /> <br />$14.00 <br /> <br />$3o.o0 <br /> <br />$4o.o0 <br />$51.00 <br /> <br />$51.00 per hour <br /> <br />23) <br /> <br />24) <br /> <br />25) <br /> <br />Re-inspection fee assessed under <br />applicable provisions of the <br />Uniform Building Code <br /> <br />Inspections for which no fee is <br />specifically indicated (minimum <br />charge - one (1) hour) <br /> <br />Additional plan review required <br />by changes, additions, or revisions <br />to approved plans (minimum charge - <br />one (1) hour) <br /> <br />$51.00 per hour <br /> <br />· $51.00 per hour <br /> <br />$51.00 per hour <br /> <br />ELECTRICAL PLAN CHECK FEES <br /> <br /> Whenever electrical plans are required by the Building <br />Official, plan check fees shall be sixty-five percent (65%) of the <br />electrical permit fee and shall be paid at the time of submitting <br />plans. <br /> <br />~ge52 <br /> <br /> <br />