My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
96-100 - Certifying the Environmental Impact Report
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1996
>
96-100 - Certifying the Environmental Impact Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:41 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
96-100
Date
11/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
485 <br /> <br />17. <br /> <br />18. <br /> <br />19. <br /> <br />20. <br /> <br />All development sites shall be compacted and prepared in accordance with appropriate City <br />specifications, throughout Specific Plan implementation. <br /> <br />- Responsible for Implementation: <br /> <br />- Monitoring Phase: <br /> <br />- Method of Monitoring: <br /> <br />- Monitoring Agency: <br /> <br />Future applicants and construction foremen <br /> <br />Throughout Specific Plan implementation <br /> <br />Site inspections to ensure compliance <br /> <br />City Public Works Agency and Planning and <br />Building Agency <br /> <br />All structures shall be constructed in accordance with applicable structural and seismic <br />requirements of the Uniform Building Code, Structural Engineers Association of California, <br />and Santa Ana Municipal Code, subject to review of the Building Division. <br /> <br />- Responsible for Implementation: <br /> <br />- Monitoring Phase: <br /> <br />- Method of Monitoring: <br /> <br />- Monitoring Agency: <br /> <br />Future applicants <br /> <br />Prior to issuance of building permit <br /> <br />Plan check, review, and approval of building <br />permit application and building plans <br /> <br />City Planning and Building Agency <br /> <br />The City Public Works Agency shall review all future development on a proposal-by- <br />proposal basis and shall require affected applicants to submit geotechnical/soils studies to <br />the City if necessary. <br /> <br />- Responsible for Implementation: <br /> <br />City Public Works Agency <br /> <br />- Monitoring Phase: <br /> <br />Throughout Specific Plan implementation <br /> <br />Method of Monitoring: <br /> <br />Review of proposals to determine need for <br />geotechnical/soils studies; approval of prepared <br />studies, if required <br /> <br />- Monitoring Agency: <br /> <br />City Public Works Agency and Planning and <br />Building Agency <br /> <br />Prior to issuance of grading permit, future applicants shall prepare an erosion control plan <br />in accordance with City standards. <br /> <br />- Responsible for Implementation: <br /> <br />Future applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to issuance of grading permit <br /> <br />MITIGATION MONITORING PROGRAM / MIDTOWN DISTRICT SPECIFIC PLAN / EIR NO. 94-I 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.