Laserfiche WebLink
485 <br /> <br />17. <br /> <br />18. <br /> <br />19. <br /> <br />20. <br /> <br />All development sites shall be compacted and prepared in accordance with appropriate City <br />specifications, throughout Specific Plan implementation. <br /> <br />- Responsible for Implementation: <br /> <br />- Monitoring Phase: <br /> <br />- Method of Monitoring: <br /> <br />- Monitoring Agency: <br /> <br />Future applicants and construction foremen <br /> <br />Throughout Specific Plan implementation <br /> <br />Site inspections to ensure compliance <br /> <br />City Public Works Agency and Planning and <br />Building Agency <br /> <br />All structures shall be constructed in accordance with applicable structural and seismic <br />requirements of the Uniform Building Code, Structural Engineers Association of California, <br />and Santa Ana Municipal Code, subject to review of the Building Division. <br /> <br />- Responsible for Implementation: <br /> <br />- Monitoring Phase: <br /> <br />- Method of Monitoring: <br /> <br />- Monitoring Agency: <br /> <br />Future applicants <br /> <br />Prior to issuance of building permit <br /> <br />Plan check, review, and approval of building <br />permit application and building plans <br /> <br />City Planning and Building Agency <br /> <br />The City Public Works Agency shall review all future development on a proposal-by- <br />proposal basis and shall require affected applicants to submit geotechnical/soils studies to <br />the City if necessary. <br /> <br />- Responsible for Implementation: <br /> <br />City Public Works Agency <br /> <br />- Monitoring Phase: <br /> <br />Throughout Specific Plan implementation <br /> <br />Method of Monitoring: <br /> <br />Review of proposals to determine need for <br />geotechnical/soils studies; approval of prepared <br />studies, if required <br /> <br />- Monitoring Agency: <br /> <br />City Public Works Agency and Planning and <br />Building Agency <br /> <br />Prior to issuance of grading permit, future applicants shall prepare an erosion control plan <br />in accordance with City standards. <br /> <br />- Responsible for Implementation: <br /> <br />Future applicants <br /> <br />- Monitoring Phase: <br /> <br />Prior to issuance of grading permit <br /> <br />MITIGATION MONITORING PROGRAM / MIDTOWN DISTRICT SPECIFIC PLAN / EIR NO. 94-I 8 <br /> <br /> <br />