Laserfiche WebLink
NOISE <br /> <br />Construction Mitigation <br /> <br />33. Future contractors, throughout construction activities, shall ensure the following to the <br /> greatest extent possible: <br /> <br /> a. Ensure that all construction and general maintenance activities, except in an <br /> emergency, be limited to the hours of 7:00 AM to 7:00 PM, Monday through <br /> Saturday. No construction shall occur on Sundays and Federal holidays. <br /> <br /> Ensure that all onsite construction equipment have properly operating mufflers. <br /> <br />bo <br /> <br />- Responsible for Implementation: <br /> <br />- Monitoring Phase: <br /> <br />- Method of Monitoring: <br /> <br />- Monitoring Agency: <br /> <br />Long-Term Mitigation <br />34. <br /> <br />35. <br /> <br />Future applicants and construction foremen <br /> <br />During alt construction phases <br /> <br />Site inspections to ensure compliance <br /> <br />City Planning and Building Agency, Police <br />Department, and Public Works Agency <br /> <br />The City, throughout Specific Plan implementation, shall review all future projects on a <br />proposal-by-proposal basis and ensure that developments proposed along Broadway, Main <br />Street, and Seventeenth Street incorporate the following to the greatest extent: <br /> <br />a. All habitable residential exterior space (porches, patios, play yards, etc.) shall not be <br /> located directly adjacent to Broadway, Main Street, and Seventeenth Street. <br /> <br /> Furore residences shall be provided with air conditioning and dual-glazed windows. <br /> City Planning and Building Agency <br /> Throughout Specific Plan implementation <br /> <br /> Review of proposals along Broadway, Main and <br /> Seventeenth to ensure compliance <br /> <br />- Monitoring Agency: City Planning and Building Agency <br /> <br />Additional noise analyses shall be conducted for those parking structures that neighbor <br />residential areas. Noise analyses would be based upon actual location, number of parking <br />spaces, parking levels, etc. <br /> <br />- Responsible for Implementation: Future applicants <br /> <br />- Responsible for Implementation: <br /> <br />- Monitoring Phase: <br /> <br />- Method of Monitoring: <br /> <br />MITIGATION MONITORING PROGRAM/MIDTOWN DISTRICT SPECIFIC PLAN/EIR NO. 94.1 14 <br /> <br /> <br />