My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
97-023 - Home Place Shopping Center Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1997
>
97-023 - Home Place Shopping Center Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:20 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
97-23
Date
5/19/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grading plan check and field inspections <br /> <br />Building Division: Senior Plan Check <br />Engineer; Planning Division: Case Planner; <br />Environmental Coordinator <br /> <br />Timing of Implementation/Verification <br /> <br />Speed bumps shall not be allowed along the northern most driveway. <br /> <br />Timing of Implementation/Verification Prior to issuance of a building permit. <br /> · ' Building plan check and field inspection <br /> <br />Responsible Parties Building Division: Senior Plan Check <br /> Engineer; Planning Division: Case Planner; <br /> Environmental Coordinator <br /> <br />Signs shall be posted on-site restricting vehicular speed to 5 MPH. <br /> <br /> Prior to issuance ora certificate of <br /> occupancy <br /> <br /> Visual site inspection. <br /> <br /> Building Division: Inspection Services <br /> Manager; Planning Division: Case Planner; <br /> Environmental Coordinator <br /> <br />Signs shall be posted in the loading dock areas prohibiting the use of vehicle horns and <br /> <br />yelling. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of a certificate of <br />occupancy <br /> <br />Visual site inspection. <br /> <br />Building Division: Inspection Services <br />Manager; Planning Division: Case Planner; <br />Environmental Coordinator <br /> <br />Prior to installation and operation of any outdoor paging system for retail buildings 1,2 or <br />3, an acoustical study will be prepared to confirm that any resultant noise impact on those <br />adjacent residential users does not exceed the City's noise criteria threshold or 55 dBA <br />during daytime periods. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to issuance of a certificate of <br />occupancy for each retail building and on- <br />going during building occupancy. <br /> <br />155 <br /> <br />15 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.