My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
99-030 - Uniform Schedule of Fees and Repealing Resolution No. 98-017
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1999
>
99-030 - Uniform Schedule of Fees and Repealing Resolution No. 98-017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 1:52:38 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
99-30
Date
6/21/1999
Document Relationships
2000-040 - Uniform Schedule of Miscellaneous Fees for Fiscal Year 2000-2001
(Repealed By)
Path:
\Resolutions\CITY COUNCIL\2000 - 2010\2000
98-017 - Uniform Schedule of Fees and Repealing Resolution No. 97-030
(Repeals)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION ~9-030 <br /> <br />REVENUE <br />ACCOUNT <br /> <br /> ;iH3 <br /> <br />5913 <br /> <br />5913 <br /> <br />/~'913 <br /> <br /> 5913 <br /> <br /> 5913 <br /> <br />5913 <br /> <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br /> <br />13) Temporary construction lighting: <br /> <br /> 500 lamps or less <br /> Over 500 lamps <br /> <br />14) Temporary services: <br /> <br /> At the time of application for temporary power, the <br /> owner shall post a $1,000.00 cash or surety bond <br /> conforming to the Santa Ana Municipal Code Section <br /> 8-1768 for each service meter. This bond shall be <br /> released upon request after the Certificate of <br /> Completion or Certificate of Occupancy is issued. <br /> <br /> Temporary electric service prior to final approval <br /> or occupancy, each meter <br /> <br /> Temporary work with service, each meter <br /> <br />15) Lighting standards: <br /> <br /> With one (1) fixture each <br /> <br /> Each additional fixture on the same standard <br /> <br />16) Time clock or photo electric cell, each <br /> <br />17) Radiant ceiling heat per room <br /> <br />18) Power apparatus: generators, motors, transformers, <br /> rectifiers, synchronous converters, capacitors, <br /> industrial heating, cooking or baking equipment, and <br /> other apparatus as follows: <br /> <br /> (Ratings - horsepower (HP), kilowatts (KW), and <br /> Kilovolt amps (KVA)) <br /> <br /> Up to and including 1 HP, KW, KVA each <br /> Over 1 and not over 10 HP, KW, KVA each <br /> Over 10 and not over 50 HP, KW, KVA each <br /> Over 50 and not over 1130 HP, KW, KVA each <br /> Over 100 and not over 500 HP, KW, KVA each <br /> Over 500 HP, KW, KVA each <br /> <br />19) Demolition, per project <br /> <br />55 <br /> <br />UNIT <br /> <br />Each Meter <br />Each Meter <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Per Room <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />179 <br /> <br />PROPOSED <br />FY 9%00 <br /> <br />3.25 <br />5.50 <br /> <br />136.00 <br /> <br />19.50 <br /> <br />7.25 <br /> <br />2.15 <br /> <br />5.50 <br /> <br />7.25 <br /> <br /> 3.00 <br /> <br /> 7.75 <br /> <br />15.25 <br /> <br />32.50 <br /> <br />43.00 <br /> <br />55.00 <br /> <br />21.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.