Laserfiche WebLink
EXHIBIT A <br /> <br />TRENCH CUT FEE <br />FEE SCHEDULE <br /> <br />ARTERIAL STREET <br /> <br />Resurfaced between 0 and 5 years. <br />Resurfaced between 6 and 10 years. <br />Resurfaced between 11 and 15 years. <br />Resurfaced between 11 and 15 years. <br /> <br />Per Square Foot <br /> <br />$13.68 <br />$12.11 <br />$11.39 <br />$9.11 <br /> <br />LOCAL STREET <br /> <br />Per Square Foot <br /> <br />Resurfaced between 0 and 5 years. <br />Resurfaced between 6 and 10 years. <br />Resurfaced between 11 and 15 years. <br />Resurfaced between 16 and 20 years. <br />Resurfaced between 21 and 25 years. <br /> <br />$ 9.27 <br />$ 8.24 <br />$ 7.74 <br />$ 6.98 <br />$ 6.21 <br /> <br />Fee Calculation: <br /> <br />For the purpose of fee calculation, the minimum width of trench shall be deemed to be <br />one foot. <br /> <br />"Arterial street" is as defined and designated in the Circulation Element of the City's <br />General Plan. A "local street" shall be, for purposes of this trench cut fee, all other <br />streets which do not meet this definition and designation of "arterial streets." <br /> <br />Resolution No. 2001-063 <br /> Page 5 of 5 <br /> <br /> <br />