Laserfiche WebLink
Schedule of Hourly Rates for Services Performed <br />by our Company for the City of Santa Ana <br />on call survey <br /> <br />Effective October 1, 2002 through September 30, 2003 <br /> <br />Licensed Surveyor 9120.00 <br />Technician/CAD Operator 985.00 <br />One Person Survey Party w/equipment 9105.00 <br />Two Person Survey Party w/equipment 9175.00 <br />Three Person Survey Party w/equipment 9225.00 <br /> <br />Rate to complete a sewer manhole template on a <br />manhole that has an elevation <br /> <br />9236.00* per manhole <br /> <br />*Leveling cost, if needed, will be an additional charge, determined on a <br /> <br />case by case estimate. <br />Clerical/Delivery <br /> <br />Prints, research material & other incidental supplies <br /> <br />Dual Frequency G.P.S.Equipment - <br /> <br /> 935.00 <br /> <br /> Cost + 10% <br /> <br />2 Units 9250/day <br />3 Units 9375/day <br />4 Units 9500/day <br /> <br />Authorized overtime shall be charged et 1.35 times the regular rate except for Sundays and/or <br />holidays. Rates for Sunday shall be 1,75 times the regular rate and for holidays it shall be 2.5 <br />times the regular rates. <br /> <br />Daily overtime billing for field survey work during Monday through Friday does not commence <br />until 8 hours of on-site work has been completed. (Travel time is not charged at overtime <br />rates.) <br /> <br />The above rates are based on current wage and overhead costs and are subject to change in <br />the same percentage as the change in wage rates in our agreement with Operating Engineers <br />Local 12 Union, Said changes are effective October 1st of each year. <br /> <br />S:\SHARED\RATES\2002-2003\Santa-ana-2002-2003 Manholes.DOC <br /> <br />CS 357 FOILM: C ~1~ ....... d Serdngs',lshcedyLLogal Settin§s\Tem po rary Eat ernet Files\OLKA\Ag ....... Package ~o~ Johnson-Frank 2003-2OO3.do¢ EXHIBIT <br /> <br /> <br />