Laserfiche WebLink
<br />8 <br /> <br />8 <br /> <br />Exhibit D <br />(continued) <br /> <br />PHASE TWO <br /> <br />Equipment Installation - Fiscal Year 03/04 <br /> <br /> <br />Pro' ect Location S stem E ui ment Tax Services Subtotal <br />Santa Ana Senior $9,063.3 <br />Center <br />emorial Center EAX2000 IPS 7 539.49 <br />erome Center EAX2000 IPS 8329.62 <br />1 Salvador Center EAX2400 IPS 8 152.42 <br /> <br /> <br />Maintenance cost reduction during and after warranty period <br /> <br />Each replacement telephone system is covered by a I-year warranty. The warranty period will <br />begin upon acceptance by the City of a fully functional replacement telephone system. During the <br />warranty period for each replacement telephone system, the yearly NBC maintenance Agreement <br />will be reduced by $.82 per new port. After the warranty period, the port charge for all ports in <br />each system will be reduced from $.82 to $.75 per port for the duration of the NEC maintenance <br />Agreement. These reductions are reflected below. <br /> <br />Warranty Year <br />T ,oc.~t1on New Ports** Renudion <br />Santa Ana Senior Ctr 12 $118.08 <br />Memorial Center 12 $118.08 <br />Jerome Center 12 $118.08 <br />E1 Salvador Center 12 $118.08 <br /> <br />Post Warranty <br />Tot~l Ports*** Renlldion <br />12 $10.08 <br />12 $10.08 <br />12 $10.08 <br />12 $10.08 <br /> <br />**New port count based upon current system configuration - update after installation <br />***New and old port count based upon current system configuration - update after warranty ends <br /> <br />Page 3 of 4 Pages <br />