My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMMUNICATIONS SUPPORT 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
C (INACTIVE)
>
COMMUNICATIONS SUPPORT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 12:50:01 PM
Creation date
11/6/2003 11:01:33 AM
Metadata
Fields
Template:
Contracts
Company Name
Communications Support Group
Contract #
A-2003-204
Agency
Parks, Recreation, & Community Services
Council Approval Date
9/15/2003
Expiration Date
10/31/2004
Insurance Exp Date
4/2/2005
Destruction Year
2009
Notes
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASO rating of picture distortions on all channels <br />C. The following inspections shall be made at the headend: <br />Stand -by -carriers <br />NET patch bays and switching bridges <br />Subscriber patch bays and switching bridges <br />Stand-by power generators <br />Radio carriage <br />Aural levels <br />Emergency override equipment <br />Installation of leased access equipment <br />Microwave and satellite receive equipment <br />D. The following inspections shall be performed at the Grantee's office and <br />elsewhere: <br />Telephone answering equipment <br />Billing, converter, and converter addressing computer equipment <br />Parental control lock systems <br />II1. Prepare a final comprehensive report (test and summary report) following the conclusion <br />of the performance test. <br />A. The test report shall include a description of testing methods, testing criteria, list <br />of locations tested, test scores, original black and white photographs of several of <br />the measurement parameters (carrier -to -noise, sweep, composite triple beat), as <br />well as site identification photographs. <br />B. The summary report ("Executive Report") shalt employ graphs and charts <br />summarizing the scores of all testpoints and make comparative analysis of the test <br />results to the minimum standards found in the Grantee's franchise and the current <br />CFR 47 Part 76 (FCC) Rules and Regulations. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.