Laserfiche WebLink
- New and existing utilities with owners identified as a result of response received <br />from utility owners. <br />Plans will be included with the previously prepared plans for Edinger Avenue. <br />Product: - Utility Pothole and Relocation Disposition Plans at a scale of 1:200 (Approximately <br />18 sheets) <br />PHASE 2 PLANS, ESTIMATES & SPECIFICATIONS <br />In order to provide for changes to the existing conditions resulting from the <br />construction of Edinger Avenue Segment 2 (City of Tustin) in advance of Segment <br />1 (City of Santa Ana), Plans and Specification revisions for the purpose of <br />construction administration by the City of Tustin requires revisions to various plan <br />sheets as follows: <br />It is assumed that the preparation of plans will be in micro station format and that <br />conversion to AutoCAD will be accordance with the previously approved contract. <br />AM4 Task 4 Revise Title Sheet, Details and Typical Sections <br />1. Prepare a new City of Tustin Title Sheet (1 Sheet) <br />2. Prepare revised Typical Cross sections (1 Sheet) <br />3. Revise Layout Plans (2 Sheets) <br />4. Revise Stage Construction Plans (2 Sheets) <br />5. Revise Pavement Delineation Plans (1 Sheet) <br />6. Revise Storm Drain Sheet (1 Sheet) <br />AM4 Task 5 Revised Specifications and Bid Documents <br />Activities: As a result of our previous experience with the City of Tustin it is anticipated that <br />revisions to the specification format will be necessary to assure consistency with <br />the City of Tustin specification format. Consultant will amend the quantities as a <br />result of the modifications to the plans resulting from the advanced construction of <br />Segment 2. This task includes translation of previously prepared specifications <br />from Word Perfect to Word format and revisions to the quantities resulting from the <br />plan revision described in Task 4. Consultant shall amend the Special Provisions <br />portion of the Construction Specifications and Contract Documents suitable for <br />bidding and award of the Contracts to accommodate the new plan revisions. These <br />special provisions shall be incorporated into the Client's standard construction <br />document package. Specifications of the project will conform with the most recent <br />applicable standards and specifications from the following: <br />a. City of Tustin <br />b. Standard Specifications for Public Works Construction (Green Book) <br />C. State of California Standard Specifications and Standard Plans <br />AM4 Task 6 Revise Legal Descriptions and Plans (Del Amo) <br />This task provides for revisions to one (1) previously prepared legal description and <br />exhibits and associated plans to remove the bus stop at Del Amo and Edinger <br />JN 10- 034145 <br />