My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CTL ENVIRONMENTAL SERVICES, INC. 1-2003
Clerk
>
Contracts / Agreements
>
C
>
CTL ENVIRONMENTAL SERVICES, INC. 1-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:14:44 PM
Creation date
1/7/2004 10:46:58 AM
Metadata
Fields
Template:
Contracts
Company Name
CTL Environmental Services
Contract #
N-2003-150
Agency
Police
Expiration Date
6/30/2004
Insurance Exp Date
7/1/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />". '.-. <br /> <br />City of Santa Ana <br />October 21, 2003 <br />CTL Proposal #A-O23-8632 <br />Page 2 <br /> <br />0 Analysis of Samples - Air (Lead): Air samples are collected and analyzed in accordance <br />with NIOSH Method 7082. All samples are retained for a period of 30 days, unless <br />requested in writing to retain the samples for a longer period of time. <br /> <br />0 Analvsis of Samples - Surface Wipe (Lead): Surface wipe samples are collected using <br />HUD protocol and analyzed in accordance with NIOSH Method 3050/7420. All samples <br />are retained for a period of 30 days, unless requested in writing to retain the samples for a <br />longer period of time. <br /> <br />0 Analysis of Samples - Soil (Lead): Soil samples are collected using HUD protocol and <br />analyzed in accordance with EPA Method SW-846. All samples are retained for a period <br />of 30 days, unless requested in writing to retain the samples for a longer period of time. <br /> <br />CLOSE-OUT DOCUMENTATIONIFINAL REPORT FORMATS <br /> <br />CTL shall provide two (2) bound copies of the final close-out documentation within three <br />weeks of project completion to clearly summarize all project related activities and analytical <br />results, which incorporates the following: <br /> <br />. Analytical and Abatement Procedures/Summary of the Project <br />. Copies of All Air, Soil, and Surface Wipe Sampling Forms with their Analytical Results <br /> <br />FEE SCHEDULES <br /> <br />The following fee schedule is an estimate only. CTL will only invoice for the number of <br />samples analyzed. <br /> <br /> <br />Project Manager l@ 95.001hr $95.00 <br />Technician 8 hours (à¿ $65.001hr $520.00 <br />Clerical 2 ills (à¿ $501hr $100.00 <br />Sample Analysis - Lead in Air (3-5 day 2 @ $15.00 each $30.00 <br />turnaround) <br />Sample Analysis - Lead Surface Wipe (3-4 7 @ $15.00 each $105.00 <br />day turnaround) <br /> Estimated Project Total $850.00 <br /> <br />'fl' cn Environmental Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.