My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Presentation - Item 17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
03/04/2025
>
Presentation - Item 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 7:56:38 PM
Creation date
3/4/2025 7:56:27 PM
Metadata
Fields
Template:
City Clerk
Date
3/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bristol Street Improvements Project -Phase 4 <br />Public Works Agency <br />Item 17 <br />March 04, 2025 <br />Slide 10 <br />PROTECTED BICYCLE LANES <br />•Class IV bike lanes will be constructed <br />separately through a future contract. <br />•Protected Bike Lanes from Warner to Edinger <br />are funded by two federal grants. <br />•City has completed design and is awaiting <br />Caltrans approval to proceed with construction <br />•Due to unknown timeline for approval to <br />proceed with federal grant project, staff <br />recommends proceeding with Bristol widening <br />project as-is <br />•As soon as approvals are received the bicycle <br />lane project will be released for bid and <br />constructed towards the end of the widening <br />project. <br />•As part of the contract documents, the <br />contractor is required to coordinate with the <br />construction of the bike lane project.
The URL can be used to link to this page
Your browser does not support the video tag.