<br />Table 1 SAVINGS TABLE
<br />
<br />EXHIBIT D
<br />
<br />Year                       Annual        Annual              Designated          Annual                Annual
<br />                           Energy        Operational         Utility Rebate      Total Projected       Guaranteed
<br />                           Savings       Savings                                 Savings               Savings
<br />Year 0 Construction        $100,000      $44,647             $105,000            $249,647              $193,885
<br />Year 1                     $311,026      $62,275                                 $373,301              $371,107
<br />Year 2                     $318,802      $63,832                                 $382,634              $380,360
<br />Year 3                     $326,772      $65,428                                 $392,200              $390,644
<br />Year 4                     $334,941      $67,063                                 $402,005              $392,676
<br />Year 5                     $343,315      $68,740                                 $412,055              $394,025
<br />Year 6                     $351,897      $70,459                                 $422,356              $395~408
<br />Year 7                     $360,695      $72,220                                 $432,915              $396,825
<br />Year 8                     $369,712      $74,025                                 $443,738              $398,278
<br />Year 9                     $378,955      $75,876                                 $454,831              $399,767
<br />Year 10                    $388,429      $77,773                                 $466,202              $401,293
<br />
<br />(Table 1 is based on a utility escalation rate of 2.5% per year, and o ~erational savings escalation of
<br />2.5% per year)
<br />
<br />Section 2: Guaranteed Savings Types
<br />
<br />2.1 Guarantee Types. Option A - Main Meter Comparison, and Option B- Designated.
<br />
<br />Option A - Main Meter Comparison. This approach is intended for measurements of the
<br />whole-facility or specific meter baseline energy use, and measurements of whole-facility or
<br />specific meter post-implementation (Post) energy use can be measured. The methodology
<br />to establish baseline and Post parameter identification, modeling approach and baseline or
<br />model adjustments will be defined in the Measurement and Verification article of this
<br />Exhibit D. Periodic inspections of baseline energy usage, operating practices, and facility
<br />and equipment, and meter measurements of the will be necessary to verify the on-going
<br />efficient operation of the equipment, systems, practices and facility, and saving attainment.
<br />The predetermined schedule for data collection, evaluation, and reporting will be defined in
<br />the Performance Assurance Technical Support Program article of this Exhibit D.
<br />
<br />Option B- Designated. This approach is intended for Facility Improvement Measures
<br />where the end use capacity or operational efficiency; demand, energy consumption or
<br />power level; or manufacturer's measurements, industry standard efficiencies or operating
<br />hours are known in advance, and used in a calculation or analysis method that will stipulate
<br />the outcome. Both Customer and Contractor agree to the stipulated inputs and outcome(s)
<br />of the analysis methodology. Based on the established analytical methodology the savings
<br />stipulated will be achieved upon completion of the Facility Improvement Measures Work