Laserfiche WebLink
<br />.-- -.- <br /> <br />RESOLUTION}~ <br />REVENUE FY '"-OS <br />~ DEPARTMENTIMISCELLANEOUS FEE OR SERVICE !I!!!X FEES <br />SECfION X PLANNING" BUILDING AGENCY <br /> FEE SCHEDULE <br />5915 I) For the installation or relocaûon of each t'orecckir or <br /> gnvity-type furnace or burner, includin¡ ducts and <br /> vents attM:bcd to suçb applã.nœ. gp to and includinl Eo<h 22.50 <br /> 100,000 BTIJIh <br />5915 2) For the installation or reloc:øtion ofe6Ch forced-air <br /> or gravity-type ful1l8Ce or burner, includin¡ dllCtl <br /> and vmtJattaeMd 10 such appliance over 100,000 BTIJIh E"h 32.00 <br />5915 3) For the installation or nllOG8Ûon of each boiler, comprusor, <br /> eondensing unit or belt pump up to aod inch.dinl five <br /> horsepower, or cacl1l1bsorption system 10 and indudina <br /> 100,000 8TUIb E"h 38.50 <br />5915 4) For &he installation or relocation oreach boiler, <br /> cumpreswr, wrnlcnsinj wi. or heat pu~ over fiye <br /> honepower up to and including 30 horwpowe:r or <br /> for each absorption sysa:em <m:r 100,000 BTUIh up <br /> 10 and includins 1,000,000 BTUIh E~h 38.50 <br />5915 ') For the installation, relocation of each boiler, eompreuor. <br /> condensing unit or heat pu.TJ1I over Z91\orse1)ower up to and <br /> includin¡50 horsepower or for each abaorption system over <br /> 1,000,000 BTUIh up to and including 1,7SO,OOO 8rUIh E"h 47.00 <br />5915 6) For the installation or relocation of each boiler. compressor, <br /> condensing unit or heat pwnp over 49 honepower, or CKh <br /> absorption system over 1,750,000 BTUIh E~h 64.25 <br />5915 7) FOI' eII!::h V A V control box or air handling <br /> Ußit to and including 2,000 tubic feci per minute, <br /> including durn attached thereto rnh 15.25 <br />5915 ') For each V A V or air-handlil18 unit over 2,000 çfm rnh 22.50 <br /> Nok; This ree:shall not apply to an air-bandlin¡ <br /> ullit which is a portion of a factory assemhled <br /> appliance, cooling unit, evaporative eook:r or <br /> absorption unit for which a pennit is required else <br /> where in this code. <br />:591:5 9) Outdoor dual packa¡ed heating and cooling EKh 38.50 <br />:5915 10) FOT the il1stallation or relocation of each noor <br /> fumaoc, including vent ...h 22.50 <br />5915 II) For the: installation or relocation of C8Ch suspended <br /> heater, recessed wall heater or floor-mounted unit heater rnh 22.50 <br />S915 12) Decorative fireplau E~h 22.50 <br />5915 J3) For the repair of, altenation of, 01' additiOIl to each heatin¡ <br /> appliance. I'tfri¡eration unit, cooling unll, absorption <br /> unit, OT each heatin; coolin¡, absorption, OJ' evaporative <br /> cooling s)'Stt'm, il1l:luding installation of controls <br /> regulated by this code rnh 15.25 <br /> N~: Each HV AC system served by a V A V <br /> control box is COß,idcJc¡d a separate system. <br />591:5 14) Forthe installation of each Type I commen:ial <br /> kitchen hood which it served by mechanical ewUlt, <br /> including Ihe duc[5 for each hood rnh 38.50 <br />:5915 IS) For the installation of~h Type IJ raidentiaJ Qr <br /> eornmen:ial kitt:hen hood! which it terVed by tne(:hanial <br /> Wuw3I. inçluding the duc13 for eath hood Each 2'-''' <br /> 49 <br /> <br />Resolution No. 2004-033 <br />Page 54 of 60 <br />