Laserfiche WebLink
<br />8 <br /> <br />8 <br /> <br />8 <br /> <br />MITIGATION MEASURE <br /> <br />Building plans for <br />the proposed <br />project shall <br />reflect a raised <br />curb around the <br />perimeter of the <br />garage area to <br />retain surface <br />water runoff <br />onsite. <br /> <br />The service <br />shall <br />constructed <br />drain to <br />underground <br />clarifier/sump/tank <br />equipped with a <br />shut-off valve that <br />can stop further <br />drainage of storm <br />water or spilled <br />material into the <br />street and storm <br />drain system. <br /> <br />area <br />be <br />to <br />an <br /> <br />Construction plans <br />for the proposed <br />project shall <br />reflect that Best <br />Management <br />Practices would be <br />employed for all <br />exterior <br />construction <br />activities. <br /> <br />AMERICA'S TIRE <br />ER 03-232 <br /> <br />TIMMING <br /> <br />Prior to <br />Building <br />Permits <br /> <br />Prior to <br />Building <br />Permits <br /> <br />Prior to <br />Building <br />Permits and <br />during <br />construction <br /> <br />þJA380f38 <br />7~D-47 <br /> <br />RESPONSIBLE <br />AGENCY <br />Building/Planning <br /> <br />Building/Planning <br />Public Works <br /> <br />. <br />Building/Planning <br /> <br />VERIFICATION <br />