Laserfiche WebLink
<br />8 <br /> <br />8 <br /> <br />8 <br /> <br />One Broadway Plaza <br />Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />. <br /> <br />Changes or alterations have been required in, or incorporated into, the project which <br />avoid or substantially lessen the significant environmental effect as identified in the EIR. <br /> <br />. <br /> <br />Such changes or alterations are within the responsibility and jurisdiction of another public <br />agency and not the agency making the finding. Such changes have been adopted by such <br />other agency or can and should be adopted by such other agency. <br /> <br />. <br /> <br />Specific economic, legal, social, technological or other considerations, including <br />provision of employment opportunities for highly trained workers, make infeasible the <br />mitigation measures or project alternatives identified in the Final EIR. <br /> <br />2. Based on the Findings stated herein and information contained in the record, it is hereby <br />determined that: <br /> <br />a. All significant adverse impacts on the environment due to the approval of the project <br />have been eliminated or substantially lessened where feasible. <br /> <br />b. Any remaining significant adverse impacts on the environment found unavoidable are <br />acceptable due to the factors described in the Statement of Overriding Considerations in <br />Section 7.0, above. <br /> <br />10. APPROVALS <br /> <br />The City hereby takes the following actions: <br /> <br />1. The City has certified the Final EIR for the project, as described in Section 1.0, above. <br /> <br />2. The City hereby adopts, incorporates into the project and makes a condition of the project <br />approval, all mitigation measures in the Final EIR, and as discussed in the Findings (Section <br />2.0, above) and Project Impacts and Disposition of Related Mitigation Measures in the Final <br />EIR (Section 4.0, above). <br /> <br />3. The City hereby adopts the Mitigation Monitoring Program, accompanying the Final EIR and <br />discussed in the Findings (Section 5.0, above). <br /> <br />4. The City hereby adopts the Findings in their entirety, as set forth above, including the <br />Statement of Overriding Considerations. <br /> <br />5. Having certified the Final EIR, independently reviewed and analyzed the Final EIR, <br />incorporated mitigations into the project as conditions of project approval, and adopted the <br />Findings (including the Statement of Overriding Considerations set for herein), the City <br />hereby approves the One Broadway Plaza Project, as described in the Final EIR, including <br />the site approval and design. <br /> <br />Resolution No. 2004-020 <br />Page 73 of 73 <br />