My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - TENTATIVE TRACT MAP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
08/02/2004
>
31A - TENTATIVE TRACT MAP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:34 PM
Creation date
8/6/2004 11:16:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
8/2/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Conditions for Approval for Tentative Tract Map No. 2004-02 <br /> <br />Tentative Tract Map No. 2004-02 (County Map No. 16576) is approved subject to compliance, to the <br />reasonable satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the Uniform Fire Code, the Uniform Building <br />Code and all other applicable regulations. <br /> <br />The applicant must comply in full with each and every condition listed below prior to exercising the <br />rights conferred by this approval. <br /> <br />The applicant must remain in compliance with all conditions listed below throughout the life of the <br />tentative tract map. Failure to comply with each and every condition may result in the revocation of <br />the tentative tract map. <br /> <br />A. <br /> <br />Plannina Division <br /> <br />1. <br /> <br />Covenants, Conditions and Restrictions (CC&Rs) are required prior to final map <br />approval addressing operational standards, common area maintenance, drainage, <br />architecture, parking and circulation. The CC&Rs shall be recorded with the final <br />map. <br /> <br />2. <br /> <br />Two copies of the recorded final parcel map and CC&Rs shall be submitted each to <br />the Planning Division, Building Division and Public Works Agency within 10 days of <br />recordation. <br /> <br />3. <br /> <br />The tentative tract map, final map and all improvements required to be made or <br />installed by the subdivider shall be in accordance with the requirements and design <br />standards and specifications of the City of Santa Ana and the requirements of the <br />State Subdivision Map Act. <br /> <br />4. <br /> <br />After project occupancy, landscaping is to be maintained in accordance with the <br />landscape plan approved for the project. This shall include the minimum levels of <br />plant materials shown on the landscape plan and installed at the time of occupancy. <br /> <br />Mitiaation Measures <br /> <br />5. <br /> <br />All materials excavated or graded will be sufficiently watered to prevent excessive <br />amount of dust. Watering with complete coverage shall occur at least twice daily, <br />once in the late morning and once after work is done for the day. <br /> <br />6. <br /> <br />All clearing and earthwork activities shall cease during period of high winds (winds <br />greater than 25 mph averaged over one hour) or during Stage 1 or Stage 2 smog <br />episodes. <br /> <br />Streets surrounding the project site should be cleaned at the end of each day of <br />construction. <br /> <br />7. <br /> <br />EXHIBIT "A" <br /> <br />31A-86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.