My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - TENTATIVE TRACT MAP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
08/02/2004
>
31A - TENTATIVE TRACT MAP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:34 PM
Creation date
8/6/2004 11:16:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
8/2/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />28. <br /> <br />29. <br /> <br />30. <br /> <br />31. <br /> <br />32. <br /> <br />33. <br /> <br />34. <br /> <br />35. <br /> <br />36. <br /> <br />37. <br /> <br />38. <br /> <br />39. <br /> <br />All construction equipment shall be properly maintained and tuned to minimize noise <br />emissions. <br /> <br />All equipment shall be fitted with properly operating mufflers and air intake silencers <br />no less efficient than those originally installed. <br /> <br />Stockpiling and vehicle staging areas shall be located away from existing residential <br />uses. <br /> <br />The name and telephone number of a contact person shall be posted on-site. <br /> <br />Construction shall be subject to any and all provisions set forth by the City of Santa <br />Ana Planning Department. <br /> <br />Prior to the issuance of building permits, the project developer shall submit evidence <br />to the City of Santa Ana of a fee payment between the developer and the Garden <br />Grove School District to offset school facility impacts. <br /> <br />Prior to issuance of building permits, the project shall pay Area F Transportation <br />System Improvement fee. <br /> <br />The site plan for the proposed project shall reflect the construction of a six-inch public <br />water main and appurtenances at 10-feet north of the centerline of Lincoln Way. The <br />project applicant shall coordinate with the City of Santa Ana Water Department <br />regarding the final depths, and locations and of the proposed water distribution <br />facility. <br /> <br />The site plan for the proposed project shall reflect the construction of a six-inch public <br />water main and appurtenances at 10-feet north of the centerline of Eleventh Street <br />and to extend approximately 200-feet to the east of the centerline on Jackson Street. <br />The project applicant shall coordinate with the City of Santa Ana Water Department <br />regarding the final depth, and locations and of the proposed water distribution facility. <br /> <br />Water conservation measures recommended by the State Department of Water <br />Resources and applicable state laws requiring the use of water-efficient plumbing <br />fixtures and recommendations for low-water using landscape shall be incorporated <br />into the project design as appropriate. <br /> <br />The site plan for the proposed project shall reflect the construction of an eight-inch <br />private sewer main and manhole at five feet to the south of the centerline on <br />Eleventh Street and to extend approximately 200 feet to the east of centerline on <br />Jackson Street. The project applicant shall coordinate with the City of Santa Ana <br />Water Department regarding the final depth, and locations of the proposed sewer <br />distribution facility. <br /> <br />The proposed project shall verify if the existing sewer line along the length of the <br />project site is active or abandoned. <br /> <br />EXHIBIT "An <br /> <br />31A-89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.