Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />APPENDIX A <br />(Continued) <br /> <br />Proposal Response Form <br /> <br />Sample Job #1 : <br /> <br />Scope of Work: Provide and install (4) Category 5 cables, at 200 feet each, to the same <br />location in an air return ceiling area. Two cables will be terminated into a contractor-provided <br />24-port patch panel on one-side and 8P8C-type Category 5 modules on the station side; the <br />other two cables will be terminated into a contractor-provided 300FT 11 O-block assembly and <br />again 8P8C-type Category 5 modules on the station side. Assume a clear path in the ceiling <br />to the patch panel and the station side, utilizing Erico J-hooks in the ceiling for cable pathway <br />support. On the station side, assume there is flex conduit running from a single gang outlet <br />box to the top of the wall, in a stub-out fashion. <br /> <br />1) Provide a breakdown of hours to be billed. <br /> <br />Place Cable 3.83 Hours <br />Terminate Station 1.17 Hours <br />Terminate Closet .33 Hours <br />Test .40 Hours <br />Total 5.73 Hours <br />2) Provide a breakdown of cost of materials. <br /> <br />See Attached Pricino Sheet <br /> <br />3) Provide details and amounts of any and all other charges that would be billed to the City. <br />See Attached Pricino Sheet <br /> <br />4) Provide approximation of elapsed time to complete work, beginning from authorization to <br />final acceptance. <br /> <br />72 Hours <br /> <br />Page 20 of 34 <br />