Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />APPENDIX A <br />(Concluded) <br /> <br />Proposal Response Form <br /> <br />SamDle Job #2: <br /> <br />Scope of Work: Contractor shall provide and install one (12/6)-multi-mode / single mode, <br />fiber optic cable running from the basement Equipment Room ERB.2 to the 8th floor <br />Telecommunications Closet TC8.1. Fiber optic cable will terminate in ERB.2 onto an <br />appropriately configured Lucent LGX Fiber Optic Distribution System, using an LST1 U-07217 <br />shelf with ST-type connectors. In TC8.1, fiber optic cable should terminate onto an <br />appropriately configured Lucent Sliding Combination Shelf, using a 600B2 One-Unit High <br />type shelf with ST-type connectors. Rack space required exists at both termination points. <br />One, empty 4-inch conduit exists between ERB.2 and TCB.1 (the Basement <br />Telecommunications Closet that is vertically stacked with the rest of the floors including our <br />destination closet, TC8.1). Contractor shall provide and install (4) one inch, non-plenum, <br />corrugated innerduct from ERB.2 to TCB.1 via existing 4-inch conduit noted above which is <br />150 ft in length. At exit point of conduit, transition (1) of (4) installed innerduct to (1) one inch, <br />riser-rated, corrugated innerduct, which will traverse from the basement, stacked <br />Telecommunications Closet, TCB.1, up to TC8.1. Contractor shall provide (1) 4-inch core <br />hole between TCB.1 and TC1.1. Building Facilities Management has determined that floor is <br />clear of obstruction for 4-inch core. Core hole shall be sleeved, and fire stopped per local, <br />state, and industry standard codes. <br /> <br />1) Provide a breakdown of hours to be billed. <br /> <br />Place Cable 16.85 Hours <br />Terminate Station 3.92 Hours <br />Terminate Closet 3.92 Hours <br />Test 1.80 Hours <br />Total 26.48 Hours <br /> <br />2) Provide a breakdown of cost of materials. <br /> <br />See Attached Pricina Sheet <br /> <br />3) Provide details and amounts of any and all other charges that would be billed to the City. <br />See Attached Pricina Sheet <br /> <br />4) Provide approximation of elapsed time to complete work, beginning from authorization to <br />final acceptance. <br />5-10 Days <br /> <br />Page 21 of 34 <br />